Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Africa, DOM, East Europe · Photo.

Bavarian Minister of Economic Affairs Hubert Aiwanger and BMW Group Board of Management Member Dr Andreas Wendt learned about development of ...
Corporate Events
·
Corporate
·
Plants, Facilities
·
Production Plants
 
Downloads.
03.05.2021 | ID: P90420050
Bavarian Minister of Economic Affairs Hubert Aiwanger and BMW Group Board of Management Member Dr Andreas Wendt learned about development of alternative CO2-free drive technologies at the “Hydrogen Technology Day” held today at the Lightweight Construction and Technology Centre (LuTZ) at BMW Group Plant Landshut in Lower Bavaria. (05/2021)

Emblem of the fully-electric BMW iX1 in assembly at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Detailed view of the fully-electric BMW iX1 in assembly at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Emblem on the tailgate of the fully-electric BMW iX1 (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Celebrating the start of production of the BMW iX1 in Regensburg: (from left) Carsten Regent, Director of BMW Group Plant Regensburg; Milan Nedeljković, Board Member for Production at BMW AG; Britta Erdmann, Head of Assembly at the BMW Group Plant Regensburg; and Christian Bernreiter, Bavarian State Minister for Housing, Construction and Transport (11/2022).

U11
·
BMW i
·
BMW iX1
·
Technology
·
Production, Recycling
·
Sustainability
·
Corporate
·
Production Plants
·
Plants, Facilities
16.11.2022

Let´s go! Christian Bernreiter (left), Bavarian State Minister for Housing, Construction and Transport, and Milan Nedeljković, Board Member for Production at BMW AG are testing the new, fully-electric BMW iX1 during its Start of Production Celebrations (11/2022).

U11
·
BMW i
·
BMW iX1
·
Technology
·
Production, Recycling
·
Sustainability
·
Corporate
·
Production Plants
·
Plants, Facilities
16.11.2022

Logos for the fully-electric BMW iX1 with a blue border (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Installation of the front end of the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Joining Centre BMW Group Plant Regensburg: “marriage” of body and drive train for the fully-electric BMW iX1 (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Joining Centre BMW Group Plant Regensburg: “marriage” of body and drive train for the fully-electric BMW iX1 (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Assembly of coolant lines for the engine-transmission unit (HEAT) for the BMW iX1 at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Mounting the high-voltage battery for the BMW iX1 on the drive unit at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Mounting the high-voltage battery for the BMW iX1 on the drive unit at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Delivery zone for the high-voltage battery for the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Delivery zone for the high-voltage battery for the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Employee working on the engine-transmission unit (HEAT) of the fully-electric BMW iX1 (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Transmission-engine unit of the fully-electric BMW iX1 on the engine line (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Logo of the fully-electric BMW iX1 (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).

U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
16.11.2022

From left to right: Markus Fallböhmer, Senior Vice President of Battery Production at BMW AG; Hans-Peter Kemser, President and CEO of BMW Manufacturing Hungary Kft.; Milan Nedeljković, member of the Board of Management of BMW AG, Production; Péter Szijjártó, Minister of Foreign Affairs and Trade of Hungary; László Papp, Mayor of Debrecen; (11/2022)

Corporate Events
·
Corporate
·
Electrification
·
Technology
25.11.2022

Milan Nedeljković, member of the Board of Management of BMW AG, Production - Péter Szijjártó, Minister of Foreign Affairs and Trade of Hungary (11/2022)

Technology
·
Corporate Events
·
Corporate
25.11.2022

construction process of BMW Group plant Debrecen (11/2022)

Plants, Facilities
·
Production Plants
25.11.2022

construction process of BMW Group plant Debrecen (11/2022)

Plants, Facilities
·
Production Plants
25.11.2022

construction process of BMW Group plant Debrecen (11/2022)

Plants, Facilities
·
Production Plants
25.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)

Production Plants
·
Plants, Facilities
16.11.2022

Designworks, the innovation studio of the BMW Group, turns 50. In the picture: Company founder Chuck Pelly (10/2022).

Corporate Events
·
Corporate
·
BMW Group Design
·
Designworks
31.10.2022

GINA Light Visionary Model (10/2022).

Technology
·
Corporate
29.11.2022

Designworks and Landscape Forms develop modular outdoor furniture collection to enhance the city space (10/2022).

Corporate
·
Technology
·
BMW Group Design
·
BMW i
·
Alternative Drive Systems, Mobility of the Future
31.10.2022
Emblem of the fully-electric BMW iX1 in assembly at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487212
Emblem of the fully-electric BMW iX1 in assembly at BMW Group Plant Regensburg (11/2022).
Detailed view of the fully-electric BMW iX1 in assembly at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487211
Detailed view of the fully-electric BMW iX1 in assembly at BMW Group Plant Regensburg (11/2022).
Emblem on the tailgate of the fully-electric BMW iX1 (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487210
Emblem on the tailgate of the fully-electric BMW iX1 (11/2022).
Celebrating the start of production of the BMW iX1 in Regensburg: (from left) Carsten Regent, Director of BMW Group Plant Regensburg; Milan ...
U11
·
BMW i
·
BMW iX1
·
Technology
·
Production, Recycling
·
Sustainability
·
Corporate
·
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90487679
Celebrating the start of production of the BMW iX1 in Regensburg: (from left) Carsten Regent, Director of BMW Group Plant Regensburg; Milan Nedeljković, Board Member for Production at BMW AG; Britta Erdmann, Head of Assembly at the BMW Group Plant Regensburg; and Christian Bernreiter, Bavarian State Minister for Housing, Construction and Transport (11/2022).
Let´s go! Christian Bernreiter (left), Bavarian State Minister for Housing, Construction and Transport, and Milan Nedeljković, Board Member for ...
U11
·
BMW i
·
BMW iX1
·
Technology
·
Production, Recycling
·
Sustainability
·
Corporate
·
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90487678
Let´s go! Christian Bernreiter (left), Bavarian State Minister for Housing, Construction and Transport, and Milan Nedeljković, Board Member for Production at BMW AG are testing the new, fully-electric BMW iX1 during its Start of Production Celebrations (11/2022).
Logos for the fully-electric BMW iX1 with a blue border (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487228
Logos for the fully-electric BMW iX1 with a blue border (11/2022).
Installation of the front end of the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487227
Installation of the front end of the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).
Joining Centre BMW Group Plant Regensburg: “marriage” of body and drive train for the fully-electric BMW iX1 (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487226
Joining Centre BMW Group Plant Regensburg: “marriage” of body and drive train for the fully-electric BMW iX1 (11/2022).
Joining Centre BMW Group Plant Regensburg: “marriage” of body and drive train for the fully-electric BMW iX1 (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487225
Joining Centre BMW Group Plant Regensburg: “marriage” of body and drive train for the fully-electric BMW iX1 (11/2022).
Assembly of coolant lines for the engine-transmission unit (HEAT) for the BMW iX1 at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487224
Assembly of coolant lines for the engine-transmission unit (HEAT) for the BMW iX1 at BMW Group Plant Regensburg (11/2022).
Mounting the high-voltage battery for the BMW iX1 on the drive unit at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487223
Mounting the high-voltage battery for the BMW iX1 on the drive unit at BMW Group Plant Regensburg (11/2022).
Mounting the high-voltage battery for the BMW iX1 on the drive unit at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487222
Mounting the high-voltage battery for the BMW iX1 on the drive unit at BMW Group Plant Regensburg (11/2022).
Delivery zone for the high-voltage battery for the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487221
Delivery zone for the high-voltage battery for the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).
Delivery zone for the high-voltage battery for the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487220
Delivery zone for the high-voltage battery for the fully-electric BMW iX1 at BMW Group Plant Regensburg (11/2022).
Employee working on the engine-transmission unit (HEAT) of the fully-electric BMW iX1 (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487219
Employee working on the engine-transmission unit (HEAT) of the fully-electric BMW iX1 (11/2022).
Transmission-engine unit of the fully-electric BMW iX1 on the engine line (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487218
Transmission-engine unit of the fully-electric BMW iX1 on the engine line (11/2022).
Logo of the fully-electric BMW iX1 (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487217
Logo of the fully-electric BMW iX1 (11/2022).
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487216
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487215
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487214
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487213
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487209
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
U11
·
Plants, Facilities
·
Production Plants
·
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
BMW i
·
BMW iX1
 
Downloads.
16.11.2022 | ID: P90487208
Fully-electric BMW iX1 in the finishing area of assembly at BMW Group Plant Regensburg (11/2022).
From left to right: Markus Fallböhmer, Senior Vice President of Battery Production at BMW AG; Hans-Peter Kemser, President and CEO of BMW ...
Corporate Events
·
Corporate
·
Electrification
·
Technology
 
Downloads.
25.11.2022 | ID: P90489517
From left to right: Markus Fallböhmer, Senior Vice President of Battery Production at BMW AG; Hans-Peter Kemser, President and CEO of BMW Manufacturing Hungary Kft.; Milan Nedeljković, member of the Board of Management of BMW AG, Production; Péter Szijjártó, Minister of Foreign Affairs and Trade of Hungary; László Papp, Mayor of Debrecen; (11/2022)
Milan Nedeljković, member of the Board of Management of BMW AG, Production - Péter Szijjártó, Minister of Foreign Affairs and Trade of Hungary ...
Technology
·
Corporate Events
·
Corporate
 
Downloads.
25.11.2022 | ID: P90489516
Milan Nedeljković, member of the Board of Management of BMW AG, Production - Péter Szijjártó, Minister of Foreign Affairs and Trade of Hungary (11/2022)
construction process of BMW Group plant Debrecen (11/2022)
Plants, Facilities
·
Production Plants
 
Downloads.
25.11.2022 | ID: P90489340
construction process of BMW Group plant Debrecen (11/2022)
construction process of BMW Group plant Debrecen (11/2022)
Plants, Facilities
·
Production Plants
 
Downloads.
25.11.2022 | ID: P90489339
construction process of BMW Group plant Debrecen (11/2022)
construction process of BMW Group plant Debrecen (11/2022)
Plants, Facilities
·
Production Plants
 
Downloads.
25.11.2022 | ID: P90489338
construction process of BMW Group plant Debrecen (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486920
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486919
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486918
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486917
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486916
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486915
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486914
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486913
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Production Plants
·
Plants, Facilities
 
Downloads.
16.11.2022 | ID: P90486912
Short distances: The BMW Group high-voltage battery production in Regensburg is adjacent to the vehicle plant. (11/2022)
Designworks, the innovation studio of the BMW Group, turns 50. In the picture: Company founder Chuck Pelly (10/2022).
Corporate Events
·
Corporate
·
BMW Group Design
·
Designworks
 
Downloads.
31.10.2022 | ID: P90485081
Designworks, the innovation studio of the BMW Group, turns 50. In the picture: Company founder Chuck Pelly (10/2022).
GINA Light Visionary Model (10/2022).
Technology
·
Corporate
 
Downloads.
29.11.2022 | ID: P90488556
GINA Light Visionary Model (10/2022).
Designworks and Landscape Forms develop modular outdoor furniture collection to enhance the city space (10/2022).
Corporate
·
Technology
·
BMW Group Design
·
BMW i
·
Alternative Drive Systems, Mobility of the Future
 
Downloads.
31.10.2022 | ID: P90484705
Designworks and Landscape Forms develop modular outdoor furniture collection to enhance the city space (10/2022).

Add your filter tags.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit filter
Clear all
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login