BMW R nineT 100 Years & R 18 100 Years
Static video footage of the BMW R nineT 100 Years and the R 18 100 Years.
ダウンロード
Mon Dec 19 16:10:55 CET 2022 |
ID: PF0009203
BMW R nineT 100 Years & R 18 100 Years
Static video footage of the BMW R nineT 100 Years and the R 18 100 Years.
BMW R 18 B & R 18 Transcontinental. Online Clip.
Online clip about the new BMW R 18 B and BMW R 18 Transcontinental incl. quote of Gerhard Müller, Project Leader.
ダウンロード
Thu Jul 29 16:50:41 CEST 2021 |
ID: PF0008494
BMW R 18 B & R 18 Transcontinental. Online Clip.
Online clip about the new BMW R 18 B and BMW R 18 Transcontinental incl. quote of Gerhard Müller, Project Leader.
AEON at BMW Group Leipzig (clean)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
ダウンロード
Wed Mar 04 17:00:15 CET 2026 |
ID: PF0010116
AEON at BMW Group Leipzig (clean)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
AEON at BMW Group Leipzig (DE)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
ダウンロード
Wed Mar 04 17:00:15 CET 2026 |
ID: PF0010115
AEON at BMW Group Leipzig (DE)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
AEON at BMW Group Leipzig EN)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
ダウンロード
Wed Mar 04 17:00:14 CET 2026 |
ID: PF0010114
AEON at BMW Group Leipzig EN)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Warm-up for Neue Klasse at BMW Group Plant Munich:
Functional checks of new production equipment successfully completed
BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
ダウンロード
Thu Dec 18 17:00:19 CET 2025 |
ID: PF0010103
Warm-up for Neue Klasse at BMW Group Plant Munich:
Functional checks of new production equipment successfully completed
BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
20 Years BMW Group Plant Leipzig
The online video shows the last 20 years of the BMW Group plant in Leipzig, from its history through the past to the present.
ダウンロード
Fri Nov 28 17:00:01 CET 2025 |
ID: PF0010095
20 Years BMW Group Plant Leipzig
The online video shows the last 20 years of the BMW Group plant in Leipzig, from its history through the past to the present.