Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Argentina · Video.

The new aeroacoustics and E-engine center.
 
Acústica, Aerodinámica
·
Tecnología
·
Corporativo
·
Plantas, Instalaciones
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The new Aeroacoustic and E-Engine Center (AEZ) starts operations at the BMW Group's Research and Innovation Center (FIZ). The building consists of two halves: In addition to a multifunctional part with workshop, testing and measurement equipment as well as a prototype for high-voltage batteries and inverters, the AEZ is home to a technically unique wind tunnel. With a length of almost 100 m, a height of 45 m and a width of 25 m, it is the world's largest vertical acoustic wind tunnel and at the same time the quietest.
Downloads.
Mon Dec 16 17:00:06 CET 2024 | ID: PF0009855
The new aeroacoustics and E-engine center.
The new Aeroacoustic and E-Engine Center (AEZ) starts operations at the BMW Group's Research and Innovation Center (FIZ). The building consists of two halves: In addition to a multifunctional part with workshop, testing and measurement equipment as well as a prototype for high-voltage batteries and inverters, the AEZ is home to a technically unique wind tunnel. With a length of almost 100 m, a height of 45 m and a width of 25 m, it is the world's largest vertical acoustic wind tunnel and at the same time the quietest.

The BMW Group Virtual Factory.

Producción, Reciclado
·
Plantas de Producción
·
Tecnología
·
Software Development
·
Plantas, Instalaciones
Thu Jun 19 18:00:10 CEST 2025

BMW Group Virtual Factory. Collision checks for new vehicle models.

Producción, Reciclado
·
Plantas de Producción
·
Tecnología
·
Software Development
·
Plantas, Instalaciones
Thu Jun 19 18:00:10 CEST 2025

BMW i8 Roadster

I12
·
Tecnología
·
Acústica, Aerodinámica
·
i8 Coupé
·
BMW i Automobiles
Fri Jul 07 18:09:08 CEST 2017

Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed

Plantas de Producción
·
Plantas, Instalaciones
Thu Dec 18 17:00:19 CET 2025

20 Years BMW Group Plant Leipzig

Ventas y Marketing
·
Corporativo
·
Corporate Media
Fri Nov 28 17:00:01 CET 2025

BMW Group Sales Figures Q2-2025. English-speaking podcast with Jochen Goller, member of the Board of Management of BMW AG responsible for Customer, Brands, Sales.

Finanzas Corporativas, Datos, Cifras
·
Ventas y Marketing
·
Miembros del Consejo de BMW Group
·
Corporativo
Thu Jul 10 19:00:00 CEST 2025

e-mobility in the BMW Group's production network

Plantas de Producción
·
Plantas, Instalaciones
Thu May 29 18:00:01 CEST 2025

e-mobility in the BMW Group's production network

Plantas de Producción
·
Plantas, Instalaciones
Wed Mar 05 14:00:13 CET 2025

Automated Driving In-Plant (AFW)

Plantas de Producción
·
Plantas, Instalaciones
Tue Nov 26 17:30:08 CET 2024

ConnectedDrive Store

Infotainment, Conceptos de Control
·
Tecnología
·
Automated Driving
·
Sistemas de Accionamiento Alternativos, Movilidad del Futuro
·
America
·
Las Vegas
·
BMW ConnectedDrive
Mon Jan 08 17:01:00 CET 2024

LLM based car expert

Tecnología
·
Automated Driving
·
America
·
Las Vegas
·
BMW ConnectedDrive
Mon Jan 08 16:48:05 CET 2024

AR Ride Concept

Infotainment, Conceptos de Control
·
Tecnología
·
Automated Driving
·
Sistemas de Accionamiento Alternativos, Movilidad del Futuro
·
America
·
Las Vegas
·
Diseño, Prototipos y Estudios
·
BMW
·
BMW ConnectedDrive
Fri Jan 05 18:40:04 CET 2024
The BMW Group Virtual Factory.
 
Producción, Reciclado
·
Plantas de Producción
·
Tecnología
·
Software Development
·
Plantas, Instalaciones
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The BMW Group is industrialising its Virtual Factory, with production planners continuously scaling applications in the digital twins of over 30 production sites to accelerate production planning worldwide. What once required several weeks of real-world modifications and testing can now be precisely simulated in the BMW Group's Virtual Factory.
Downloads.
Thu Jun 19 18:00:10 CEST 2025 | ID: PF0010020
The BMW Group Virtual Factory.
The BMW Group is industrialising its Virtual Factory, with production planners continuously scaling applications in the digital twins of over 30 production sites to accelerate production planning worldwide. What once required several weeks of real-world modifications and testing can now be precisely simulated in the BMW Group's Virtual Factory.
BMW Group Virtual Factory. Collision checks for new vehicle models.
 
Producción, Reciclado
·
Plantas de Producción
·
Tecnología
·
Software Development
·
Plantas, Instalaciones
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


For every launch, it is essential to verify that the new product fits on the production line and does not collide with its surroundings at any point. In the BMW Group's Virtual Factory, the collision check is digital, automated and fast, using construction data combined with 3D scans. The movement and rotation of a vehicle through the production lines are precisely simulated, allowing the system to automatically check for possible collisions. What now takes just three days to simulate virtually previously required almost four weeks of real testing.
Downloads.
Thu Jun 19 18:00:10 CEST 2025 | ID: PF0010019
BMW Group Virtual Factory. Collision checks for new vehicle models.
For every launch, it is essential to verify that the new product fits on the production line and does not collide with its surroundings at any point. In the BMW Group's Virtual Factory, the collision check is digital, automated and fast, using construction data combined with 3D scans. The movement and rotation of a vehicle through the production lines are precisely simulated, allowing the system to automatically check for possible collisions. What now takes just three days to simulate virtually previously required almost four weeks of real testing.
BMW i8 Roadster
 
I12
·
Tecnología
·
Acústica, Aerodinámica
·
i8 Coupé
·
BMW i Automobiles
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Fri Jul 07 18:09:08 CEST 2017 | ID: PF0005538
BMW i8 Roadster
Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed
 
Plantas de Producción
·
Plantas, Instalaciones
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
Downloads.
Thu Dec 18 17:00:19 CET 2025 | ID: PF0010103
Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed
BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
20 Years BMW Group Plant Leipzig
 
Ventas y Marketing
·
Corporativo
·
Corporate Media
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The online video shows the last 20 years of the BMW Group plant in Leipzig, from its history through the past to the present.
Downloads.
Fri Nov 28 17:00:01 CET 2025 | ID: PF0010095
20 Years BMW Group Plant Leipzig
The online video shows the last 20 years of the BMW Group plant in Leipzig, from its history through the past to the present.
BMW Group Sales Figures Q2-2025. English-speaking podcast with Jochen Goller, member of the Board of Management of BMW AG responsible for Customer, ...
 
Finanzas Corporativas, Datos, Cifras
·
Ventas y Marketing
·
Miembros del Consejo de BMW Group
·
Corporativo
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Jul 10 19:00:00 CEST 2025 | ID: PF0010028
BMW Group Sales Figures Q2-2025. English-speaking podcast with Jochen Goller, member of the Board of Management of BMW AG responsible for Customer, Brands, Sales.
e-mobility in the BMW Group's production network
 
Plantas de Producción
·
Plantas, Instalaciones
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The film showcases the rapid transformation of the automotive industry and poses the question: How fast will the transition to electromobility progress? It first highlights the increasing demand for electric vehicles, accompanied by dynamic production imagery. The growing BEV share in the production network is illustrated through key milestones. The film emphasises production flexibility, demonstrating BMW’s ability to adapt quickly to market developments with its ICE, hybrid, and BEV plants. The global expansion of electromobility is highlighted by the establishment of new fully electric production sites in Debrecen (2025) and Munich (2027). The film concludes with BMW Group’s vision: "We don't predict the future – we build it." The future of electromobility is not just anticipated – it is actively shaped.
Downloads.
Thu May 29 18:00:01 CEST 2025 | ID: PF0009958
e-mobility in the BMW Group's production network
The film showcases the rapid transformation of the automotive industry and poses the question: How fast will the transition to electromobility progress? It first highlights the increasing demand for electric vehicles, accompanied by dynamic production imagery. The growing BEV share in the production network is illustrated through key milestones. The film emphasises production flexibility, demonstrating BMW’s ability to adapt quickly to market developments with its ICE, hybrid, and BEV plants. The global expansion of electromobility is highlighted by the establishment of new fully electric production sites in Debrecen (2025) and Munich (2027). The film concludes with BMW Group’s vision: "We don't predict the future – we build it." The future of electromobility is not just anticipated – it is actively shaped.
e-mobility in the BMW Group's production network
 
Plantas de Producción
·
Plantas, Instalaciones
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The film showcases the rapid transformation of the automotive industry and poses the question: How fast will the transition to electromobility progress? It first highlights the increasing demand for electric vehicles, accompanied by dynamic production imagery. The growing BEV share in the production network is illustrated through key milestones. The film emphasises production flexibility, demonstrating BMW's ability to adapt quickly to market developments with its ICE, hybrid, and BEV plants. The global expansion of electromobility is highlighted by the establishment of new fully electric production sites in Debrecen (2025) and Munich (2027). The film concludes with BMW Group's vision: "We don't predict the future - we build it." The future of electromobility is not just anticipated - it is actively shaped.
Downloads.
Wed Mar 05 14:00:13 CET 2025 | ID: PF0009959
e-mobility in the BMW Group's production network
The film showcases the rapid transformation of the automotive industry and poses the question: How fast will the transition to electromobility progress? It first highlights the increasing demand for electric vehicles, accompanied by dynamic production imagery. The growing BEV share in the production network is illustrated through key milestones. The film emphasises production flexibility, demonstrating BMW's ability to adapt quickly to market developments with its ICE, hybrid, and BEV plants. The global expansion of electromobility is highlighted by the establishment of new fully electric production sites in Debrecen (2025) and Munich (2027). The film concludes with BMW Group's vision: "We don't predict the future - we build it." The future of electromobility is not just anticipated - it is actively shaped.
Automated Driving In-Plant (AFW)
 
Plantas de Producción
·
Plantas, Instalaciones
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Nov 26 17:30:08 CET 2024 | ID: PF0009838
Automated Driving In-Plant (AFW)
ConnectedDrive Store
 
Infotainment, Conceptos de Control
·
Tecnología
·
Automated Driving
·
Sistemas de Accionamiento Alternativos, Movilidad del Futuro
·
America
·
Las Vegas
·
BMW ConnectedDrive
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


In conjunction with BMW Digital Premium the ConnectedDrive Store in BMW Operating System 9 offers an ever evolving range of apps. (images shows content specific to Germany).
Downloads.
Mon Jan 08 17:01:00 CET 2024 | ID: PF0009622
ConnectedDrive Store
In conjunction with BMW Digital Premium the ConnectedDrive Store in BMW Operating System 9 offers an ever evolving range of apps. (images shows content specific to Germany).
LLM based car expert
 
Tecnología
·
Automated Driving
·
America
·
Las Vegas
·
BMW ConnectedDrive
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Development demo at CES 2024: BMW voice assistant becomes the ultimate vehicle expert with the help of the Alexa Large Language Model (LLM)..
Downloads.
Mon Jan 08 16:48:05 CET 2024 | ID: PF0009625
LLM based car expert
Development demo at CES 2024: BMW voice assistant becomes the ultimate vehicle expert with the help of the Alexa Large Language Model (LLM)..
AR Ride Concept
 
Infotainment, Conceptos de Control
·
Tecnología
·
Automated Driving
·
Sistemas de Accionamiento Alternativos, Movilidad del Futuro
·
America
·
Las Vegas
·
Diseño, Prototipos y Estudios
·
BMW
·
BMW ConnectedDrive
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


AR Ride: Joint development demo with XREAL – the driving experience is expanded with content that is perfectly blended into the real world with augmented reality glasses.
Downloads.
Fri Jan 05 18:40:04 CET 2024 | ID: PF0009627
AR Ride Concept
AR Ride: Joint development demo with XREAL – the driving experience is expanded with content that is perfectly blended into the real world with augmented reality glasses.

Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View

Set publication time.

no Selection
  • no Selection
  • past 24 hours
  • past Week
  • past Month
  • past Year
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login