Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Global · Photo.

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Technology
·
Production, Recycling
·
Electrification
·
Production Plants
·
BMW Group Facilities
·
Sustainability
·
Corporate
 
Downloads.
27.11.2024 | ID: P90581205
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

The direct recycling project team at the BMW Group and its joint venture Encory (11/2024).

Production Plants
·
BMW Group Facilities
·
Sustainability
·
Corporate
·
Technology
·
Production, Recycling
·
Electrification
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

BMW Group Facilities
·
Corporate
·
Sustainability
·
Technology
·
Production, Recycling
·
Electrification
·
Production Plants
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

Technology
·
Production, Recycling
·
Electrification
·
Production Plants
·
BMW Group Facilities
·
Sustainability
·
Corporate
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

Sustainability
·
Corporate
·
Production Plants
·
BMW Group Facilities
·
Technology
·
Electrification
·
Production, Recycling
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

Sustainability
·
Corporate
·
Technology
·
Production, Recycling
·
Production Plants
·
BMW Group Facilities
·
Electrification
27.11.2024

Preliminary visualization of the Cell Recycling Competence Centre (CRCC) for battery cells in Kirchroth (11/2024).

Production Plants
·
BMW Group Facilities
·
Technology
·
Production, Recycling
·
Electrification
·
Sustainability
·
Corporate
27.11.2024

The Parsdorf project team receives the EMAS environmental certification (11/2024).

Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
Electrification
19.11.2024

From left to right: Stefan W. Zangerle, Head of Planning and Industrialization High-Voltage Battery and Battery Cell, BMW Group, and Bernd Wächtershäuser, Head of BMW Group CMCC Parsdorf, received the certification on November 18 from Manfred Gössl, CEO of the Chamber of Commerce and Industry for Munich and Upper Bavaria (11/2024).

Production, Recycling
·
Technology
·
Electrification
·
Corporate
·
Sustainability
19.11.2024

The new BMW Group Plant Debrecen in Hungary (11/2024).

Production Plants
·
BMW Group Facilities
·
Technology
·
Production, Recycling
20.11.2024

The new BMW Group Plant Debrecen in Hungary (11/2024).

Technology
·
Production, Recycling
·
Production Plants
·
BMW Group Facilities
20.11.2024

The new Aeroacoustics E-Drive Center (AEC) (11/2024)

BMW Group Facilities
·
Corporate
·
Production Plants
11.12.2024

The new Aeroacoustics E-Drive Center (AEC) (11/2024)

BMW Group Facilities
·
Corporate
·
Production Plants
11.12.2024

The new Aeroacoustics E-Drive Center (AEC) (11/2024)

BMW Group Facilities
·
Corporate
·
Production Plants
11.12.2024

The new Aeroacoustics E-Drive Center (AEC) (11/2024)

BMW Group Facilities
·
Corporate
·
Production Plants
11.12.2024

The new Aeroacoustics E-Drive Center (AEC) (11/2024)

BMW Group Facilities
·
Corporate
·
Production Plants
11.12.2024

The new Aeroacoustics E-Drive Center (AEC) (11/2024)

BMW Group Facilities
·
Corporate
·
Production Plants
11.12.2024

Pre-series Gen6 electric motor for Neue Klasse test vehicles (11/2024)

Engines, Drivetrain
·
Technology
·
BMW Group Facilities
·
Production Plants
03.12.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Dingolfing, test track (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Dingolfing, LIDAR-Sensor (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
25.11.2024

Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

BMW Group Facilities
·
Production Plants
11.12.2024

Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

BMW Group Facilities
·
Production Plants
11.12.2024

Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

BMW Group Facilities
·
Production Plants
11.12.2024

Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

BMW Group Facilities
·
Production Plants
11.12.2024

Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

BMW Group Facilities
·
Production Plants
11.12.2024

Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

BMW Group Facilities
·
Production Plants
11.12.2024

Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

BMW Group Facilities
·
Production Plants
11.12.2024

Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

BMW Group Facilities
·
Production Plants
11.12.2024

Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

Production Plants
·
BMW Group Facilities
11.12.2024

Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

Production Plants
·
BMW Group Facilities
11.12.2024

Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

Production Plants
·
BMW Group Facilities
11.12.2024

Turntable in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

Production Plants
·
BMW Group Facilities
11.12.2024
The direct recycling project team at the BMW Group and its joint venture Encory (11/2024).
Production Plants
·
BMW Group Facilities
·
Sustainability
·
Corporate
·
Technology
·
Production, Recycling
·
Electrification
 
Downloads.
27.11.2024 | ID: P90581209
The direct recycling project team at the BMW Group and its joint venture Encory (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
BMW Group Facilities
·
Corporate
·
Sustainability
·
Technology
·
Production, Recycling
·
Electrification
·
Production Plants
 
Downloads.
27.11.2024 | ID: P90581208
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Technology
·
Production, Recycling
·
Electrification
·
Production Plants
·
BMW Group Facilities
·
Sustainability
·
Corporate
 
Downloads.
27.11.2024 | ID: P90581207
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Sustainability
·
Corporate
·
Production Plants
·
BMW Group Facilities
·
Technology
·
Electrification
·
Production, Recycling
 
Downloads.
27.11.2024 | ID: P90581206
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Sustainability
·
Corporate
·
Technology
·
Production, Recycling
·
Production Plants
·
BMW Group Facilities
·
Electrification
 
Downloads.
27.11.2024 | ID: P90581204
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Preliminary visualization of the Cell Recycling Competence Centre (CRCC) for battery cells in Kirchroth (11/2024).
Production Plants
·
BMW Group Facilities
·
Technology
·
Production, Recycling
·
Electrification
·
Sustainability
·
Corporate
 
Downloads.
27.11.2024 | ID: P90581203
Preliminary visualization of the Cell Recycling Competence Centre (CRCC) for battery cells in Kirchroth (11/2024).
The Parsdorf project team receives the EMAS environmental certification (11/2024).
Corporate
·
Sustainability
·
Production, Recycling
·
Technology
·
Electrification
 
Downloads.
19.11.2024 | ID: P90580338
The Parsdorf project team receives the EMAS environmental certification (11/2024).
From left to right: Stefan W. Zangerle, Head of Planning and Industrialization High-Voltage Battery and Battery Cell, BMW Group, and Bernd ...
Production, Recycling
·
Technology
·
Electrification
·
Corporate
·
Sustainability
 
Downloads.
19.11.2024 | ID: P90580337
From left to right: Stefan W. Zangerle, Head of Planning and Industrialization High-Voltage Battery and Battery Cell, BMW Group, and Bernd Wächtershäuser, Head of BMW Group CMCC Parsdorf, received the certification on November 18 from Manfred Gössl, CEO of the Chamber of Commerce and Industry for Munich and Upper Bavaria (11/2024).
The new BMW Group Plant Debrecen in Hungary (11/2024).
Production Plants
·
BMW Group Facilities
·
Technology
·
Production, Recycling
 
Downloads.
20.11.2024 | ID: P90580602
The new BMW Group Plant Debrecen in Hungary (11/2024).
The new BMW Group Plant Debrecen in Hungary (11/2024).
Technology
·
Production, Recycling
·
Production Plants
·
BMW Group Facilities
 
Downloads.
20.11.2024 | ID: P90580601
The new BMW Group Plant Debrecen in Hungary (11/2024).
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
BMW Group Facilities
·
Corporate
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563617
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
BMW Group Facilities
·
Corporate
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563616
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
BMW Group Facilities
·
Corporate
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563615
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
BMW Group Facilities
·
Corporate
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563614
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
BMW Group Facilities
·
Corporate
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563619
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
BMW Group Facilities
·
Corporate
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563618
The new Aeroacoustics E-Drive Center (AEC) (11/2024)
Pre-series Gen6 electric motor for Neue Klasse test vehicles (11/2024)
Engines, Drivetrain
·
Technology
·
BMW Group Facilities
·
Production Plants
 
Downloads.
03.12.2024 | ID: P90581266
Pre-series Gen6 electric motor for Neue Klasse test vehicles (11/2024)
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581191
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581196
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).
Automated Driving In-Plant (AFW), Plant Dingolfing, test track (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581195
Automated Driving In-Plant (AFW), Plant Dingolfing, test track (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581194
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581193
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581192
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581190
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581189
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Dingolfing, LIDAR-Sensor (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581188
Automated Driving In-Plant (AFW), Plant Dingolfing, LIDAR-Sensor (11/2024).
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581187
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Production Plants
·
BMW Group Facilities
·
Production, Recycling
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581186
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
BMW Group Facilities
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563677
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
BMW Group Facilities
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563676
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
BMW Group Facilities
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563675
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
BMW Group Facilities
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563674
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
BMW Group Facilities
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563673
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
BMW Group Facilities
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563672
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
BMW Group Facilities
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563671
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
BMW Group Facilities
·
Production Plants
 
Downloads.
11.12.2024 | ID: P90563670
Working with the smoke lance in the Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Production Plants
·
BMW Group Facilities
 
Downloads.
11.12.2024 | ID: P90563646
Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Production Plants
·
BMW Group Facilities
 
Downloads.
11.12.2024 | ID: P90563639
Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Production Plants
·
BMW Group Facilities
 
Downloads.
11.12.2024 | ID: P90563638
Measurements in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Turntable in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)
Production Plants
·
BMW Group Facilities
 
Downloads.
11.12.2024 | ID: P90563637
Turntable in the new Aeroacoustics Wind Tunnel of the BMW Group (11/2024)

Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login