Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Global · Article.

BMW UK engine plant ramps up production of next generation engines.

Investment complete: Production of next generation engines has started on brand-new facilities. The manufacture of machined engine components is to double. Number of apprentices has trebled.

Technology
·
Production, Recycling
 

Press Contact.

Kate Bird
BMW Group

Tel: +44-1675-4-60742
Fax: +44-1675-460470

send an e-mail

This article in other PressClubs

Hams Hall. A large investment programme to develop the BMW Hams Hall engine plant near Birmingham is complete. The production of new three and four-cylinder engines is already being ramped up on brand-new production lines, and over one million components will be machined at the plant for the first time this year as supply extends to other plants in the Group.

 

The investment project, part of £750 million that has been spent across BMW Group’s UK manufacturing sites, has ensured the Hams Hall site remains a state-of-the-art facility, capable of producing the next generation of engines and securing a long-term future for the plant.

 

Engines, as well as machined components manufactured at BMW Plant Hams Hall contribute to a range of cars across BMW Group’s product portfolio. This includes MINI – the new Clubman model goes on sale in just a few weeks’ time, as well as the new BMW 7 Series, also launched this month.

 

Plant Director, Markus Fallboehmer says: “The transformation in our plant has been huge. Over the last few years we have completely re-developed our two main production areas and installed over 600 brand-new pieces of equipment and machinery. While a high level of technology and automation ensures our plant remains a state-of-the-art facility, the ergonomics of the workstations where we have more manual input have been carefully thought through and adjusted to suit each individual member of the team.

 

“A large investment has also been made in our workforce via a number of training programmes and opportunities for people to upskill and take on new job roles. We have changed the make-up of our workforce as well with over 100 people securing BMW contracts, some of whom were previously working for us on a temporary basis. Looking further ahead to the future, we have trebled the number of apprentices training with us to ensure we have a strong, skilled workforce for many years to come.”

 

Development of the site is another piece of the jigsaw in BMW Group’s global strategy for engine production. The Hams Hall facility is now operating alongside other plants in Germany and Austria, all producing the same new family of next generation engines.

 

“Our new engine family of highly efficient three, four and six-cylinder engines have a standard design, a high number of similar parts and a uniform process for manufacture,” explains Ilka Horstmeier, who heads up BMW Group’s global production network for engines and electrified powertrain. “This gives us a large amount of flexibility and means we can optimise production between each of our manufacturing locations and respond quickly to changes in customer demand or market developments. The investment in Hams Hall has enabled the plant to grow and play an ever-increasingly important role in the production of these latest engines.”

 

Production of a small number of new engines was first introduced at Hams Hall last year. Three-cylinder BMW TwinPower Turbo technology 1.5-litre petrol engines are hand-built exclusively at Hams Hall on a special production line for the BMW i8, the first purpose-built, plug-in hybrid sports car. This engine has already contributed to a series of award-wins for the revolutionary vehicle as well as two class and an overall win at the International Engine of the Year awards.

 

Overall, the new Efficient Dynamics high-tech engine family includes petrol and diesel engines, all employing TwinPower Turbo technology and ranging from 1.5 to 3.0 litres. With different power ratings, the engines can be adapted to a variety of vehicle concepts. Commonality across the engines makes it possible to be extremely flexible in achieving significant efficiences at high production volumes, as well as being able to produce additional special versions of the engines at relatively small volumes across the network of engine plants.

 

To get a glimpse inside the Hams Hall engine plant, tune in to the new BBC2 series ‘Building Cars Live’, presented by James May, Kate Humble and Ant Anstead. The Hams Hall plant is one of the key suppliers to MINI production at the Oxford-based vehicle manufacturing plant that will feature in the programme this autumn.

 

Ends

 

Photographs available.

 

Notes to Editors:

  • The Hams Hall plant has a 14-year history of producing fuel-efficient, low emission engines in the Midlands.
  • Over 3.5 million engines have been produced at the BMW Plant Hams Hall since opening in 2001.
  • The plant directly supports the jobs of around 1,000 local people including an increased number in core positions.
  • The number of young people on apprenticeships and graduate training programmes at Plant Hams Hall has trebled over the last four years.
  • When production is fully ramped-up, an engine will come off the production line at a rate of one per minute.
  • Increased capability in the machining hall will see production double this year as the supply of components is extended to other engine plants.
  • For the first time over one million parts will be machined at BMW Plant Hams Hall this year.

 

The BMW Group

With its three brands BMW, MINI and Rolls-Royce, the BMW Group is the world’s leading premium manufacturer of automobiles and motorcycles and also provides premium financial and mobility services. As a global company, the BMW Group operates 30 production and assembly facilities in 14 countries and has a global sales network in more than 140 countries.

 

In 2014, the BMW Group sold approximately 2.118 million cars and 123,000 motorcycles worldwide. The profit before tax for the financial year 2014 was approximately € 8.71 billion on revenues amounting to

€80.40 billion. As of 31 December 2014, the BMW Group had a workforce of 116,324 employees.

 

The success of the BMW Group has always been based on long-term thinking and responsible action. The company has therefore established ecological and social sustainability throughout the value chain, comprehensive product responsibility and a clear commitment to conserving resources as an integral part of its strategy.

 

 

 

Website: www.bmwgroup.com

Facebook: http://www.facebook.com/BMWGroup

Twitter: http://twitter.com/BMWGroup

YouTube: http://www.youtube.com/BMWGroupview

Google+: http://googleplus.bmwgroup.com
Media website: www.press.bmwgroup.com

 

 

For further information, please contact:

Kate Bird                               Communications, BMW Plant Hams Hall
Telephone:                           (+44) (0)1675 460 742
Mobile:                                  (+44) (0)7815 375843

e-mail:                                   kate.bird@bmwgroup.com

 


Sarah Heaney                      Corporate and Plant Communications
Telephone:                           (+44) (0)1865 825869
Mobile:                                  (+44) (0)7815 371247

e-mail:                                   sarah.heaney@bmwgroup.com

 

Article Offline Attachments.

Article Media Material.

My.PressClub Login
 

BMW Group Streaming

AUTO CHINA 2024.

Beijing. 24./25. April 2024.

Here you can see the Webcasts of the BMW Group Night and Press Conference at the Auto China 2024.

Open Streaming Page

CO2 emission information.

Fuel consumption, CO2 emission figures and power consumption and range were measured using the methods required according to Regulation VO (EC) 2007/715 as amended. They refer to vehicles on the German automotive market. For ranges, the NEDC figures take into account differences in the selected wheel and tyre size, while the WLTP figures take into account the effects of any optional equipment.

All figures have already been calculated based on the new WLTP test cycle. NEDC figures listed have been adjusted to the NEDC measurement method where applicable. WLTP values are used as a basis for the assessment of taxes and other vehicle-related duties which are (also) based on CO2 emissions and, where applicable, for the purposes of vehicle-specific subsidies. Further information on the WLTP and NEDC measurement procedures is also available at www.bmw.de/wltp.

For further details of the official fuel consumption figures and official specific CO2 emissions of new cars, please refer to the “Manual on the fuel consumption, CO2 emissions and power consumption of new cars”, available at sales outlets free of charge, from Deutsche Automobil Treuhand GmbH (DAT), Hellmuth-Hirth-Str. 1, 73760 Ostfildern-Scharnhausen and at https://www.dat.de/co2/.

Latest Facts & Figures.

Specifications of the BMW XM 50e, valid from 02/2024.
Wed Mar 06 13:48:00 CET 2024
G09
BMW M Automobiles
Specifications of the BMW i5 xDrive40, valid from 03/2024.
Thu Feb 29 15:53:00 CET 2024
G60
BMW i
Specifications of the BMW iX2 eDrive20, valid from 03/2024.
Sat Feb 17 09:00:00 CET 2024
U10
BMW i
Show all

Add your filter tags.

Press Release
Press Kit
Speech
Fact & Figures
Spanish
  • Language of file attachment
  • Arabic
  • Chinese
  • Chinese (simplified)
  • English
  • English
  • French
  • German
  • Hungarian
  • Italian
  • Japanese
  • Korean
  • Other Language
  • Russian
  • Spanish
Updates
Top-Topic
Submit filter
Clear all
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login