Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Global · Video.

Production of the MINI Countryman at BMW Group Plant Leipzig
 
Locations
·
Production Plants
·
Countryman
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The edit film shows a dynamic cut of 1:25 minutes of the most important production steps in the production of MINI Countryman at the BMW Group plant in Leipzig in the order of the production process: Press Shop, Body Shop, Conveyor Belts in the Foyer, Paint Shop, Assembly, Testing and Finish Area, Exterior Plastic Components.
Downloads.
10.11.2023 | ID: PF0009605
Production of the MINI Countryman at BMW Group Plant Leipzig
The edit film shows a dynamic cut of 1:25 minutes of the most important production steps in the production of MINI Countryman at the BMW Group plant in Leipzig in the order of the production process: Press Shop, Body Shop, Conveyor Belts in the Foyer, Paint Shop, Assembly, Testing and Finish Area, Exterior Plastic Components.

Start of production BMW i3 at BMW Plant Munich

I01
·
BMW i
·
i3
·
Production Plants
·
Locations
·
3 Series
·
Recycling
·
Production, Recycling
·
Production
06.08.2026

High-Voltage Battery Assembly at BMW Group Plant Woodruff

Locations
·
Production Plants
27.07.2026

High-Voltage Battery Assembly at BMW Group Plant Woodruff

Locations
·
Production Plants
27.07.2026

Figure 03 at BMW Group Plant Spartanburg

Locations
·
Production Plants
30.06.2026

Building the BMW X5 at BMW Group Plant Spartanburg

Locations
·
Production Plants
30.06.2026

Building the BMW X5 at BMW Group Plant Spartanburg

Locations
·
Production Plants
30.06.2026

AEON at BMW Group Leipzig (clean)

Locations
·
Production Plants
27.02.2026

AEON at BMW Group Leipzig (DE)

Locations
·
Production Plants
27.02.2026

AEON at BMW Group Leipzig EN)

Locations
·
Production Plants
27.02.2026

Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed

Production Plants
·
Locations
18.12.2025

The Body Shop at BMW Group Plant Debrecen.

Locations
·
Production Plants
23.09.2025

The Body Shop at BMW Group Plant Debrecen. (Clean)

Locations
·
Production Plants
23.09.2025
Start of production BMW i3 at BMW Plant Munich
 
I01
·
BMW i
·
i3
·
Production Plants
·
Locations
·
3 Series
·
Recycling
·
Production, Recycling
·
Production
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Images of series production BMW i3 at BMW Plant Munich
Provisional data for BMW i3 50 xDrive: WLTP combined (EnVKV): energy consumption 16.1-13.4 kWh/100 km; COâ‚‚ emissions 0 g/km; COâ‚‚ class A; range 758-912 km) Actual figures depend on various factors, e.g. charging power, driving style, route, weather conditions, auxiliary electrical consumption (including air conditioning), tyres and battery state of health. BMW iX3 50 xDrive: energy consumption combined: 18.1-15.1 kWh/100 km (WLTP); COâ‚‚ emissions combined: 0 g/km (WLTP); COâ‚‚ class(es): A; electric range: 673-805 km (WLTP)
Downloads.
06.08.2026 | ID: PF0010233
Start of production BMW i3 at BMW Plant Munich
Images of series production BMW i3 at BMW Plant Munich
Provisional data for BMW i3 50 xDrive: WLTP combined (EnVKV): energy consumption 16.1-13.4 kWh/100 km; COâ‚‚ emissions 0 g/km; COâ‚‚ class A; range 758-912 km) Actual figures depend on various factors, e.g. charging power, driving style, route, weather conditions, auxiliary electrical consumption (including air conditioning), tyres and battery state of health. BMW iX3 50 xDrive: energy consumption combined: 18.1-15.1 kWh/100 km (WLTP); COâ‚‚ emissions combined: 0 g/km (WLTP); COâ‚‚ class(es): A; electric range: 673-805 km (WLTP)
High-Voltage Battery Assembly at BMW Group Plant Woodruff
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
27.07.2026 | ID: PF0010221
High-Voltage Battery Assembly at BMW Group Plant Woodruff
High-Voltage Battery Assembly at BMW Group Plant Woodruff
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
27.07.2026 | ID: PF0010220
High-Voltage Battery Assembly at BMW Group Plant Woodruff
Figure 03 at BMW Group Plant Spartanburg
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
30.06.2026 | ID: PF0010224
Figure 03 at BMW Group Plant Spartanburg
Building the BMW X5 at BMW Group Plant Spartanburg
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
30.06.2026 | ID: PF0010223
Building the BMW X5 at BMW Group Plant Spartanburg
Building the BMW X5 at BMW Group Plant Spartanburg
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
30.06.2026 | ID: PF0010222
Building the BMW X5 at BMW Group Plant Spartanburg
AEON at BMW Group Leipzig (clean)
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
27.02.2026 | ID: PF0010116
AEON at BMW Group Leipzig (clean)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
AEON at BMW Group Leipzig (DE)
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
27.02.2026 | ID: PF0010115
AEON at BMW Group Leipzig (DE)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
AEON at BMW Group Leipzig EN)
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
27.02.2026 | ID: PF0010114
AEON at BMW Group Leipzig EN)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed
 
Production Plants
·
Locations
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
Downloads.
18.12.2025 | ID: PF0010103
Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed
BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
The Body Shop at BMW Group Plant Debrecen.
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
23.09.2025 | ID: PF0010068
The Body Shop at BMW Group Plant Debrecen.
The Body Shop at BMW Group Plant Debrecen. (Clean)
 
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
23.09.2025 | ID: PF0010067
The Body Shop at BMW Group Plant Debrecen. (Clean)

Search Settings.

HighRes MOV
LowRes MPEG-4
LowRes MOV
LowRes FLV

Set publication time.

no Selection
  • no Selection
  • past 24 hours
  • past Week
  • past Month
  • past Year
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login