Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Global · Video.

The new aeroacoustics and E-engine center.
 
Acoustics, Aerodynamics
·
Technology
·
Corporate
·
Locations
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The new Aeroacoustic and E-Engine Center (AEZ) starts operations at the BMW Group's Research and Innovation Center (FIZ). The building consists of two halves: In addition to a multifunctional part with workshop, testing and measurement equipment as well as a prototype for high-voltage batteries and inverters, the AEZ is home to a technically unique wind tunnel. With a length of almost 100 m, a height of 45 m and a width of 25 m, it is the world's largest vertical acoustic wind tunnel and at the same time the quietest.
Downloads.
11.12.2024 | ID: PF0009855
The new aeroacoustics and E-engine center.
The new Aeroacoustic and E-Engine Center (AEZ) starts operations at the BMW Group's Research and Innovation Center (FIZ). The building consists of two halves: In addition to a multifunctional part with workshop, testing and measurement equipment as well as a prototype for high-voltage batteries and inverters, the AEZ is home to a technically unique wind tunnel. With a length of almost 100 m, a height of 45 m and a width of 25 m, it is the world's largest vertical acoustic wind tunnel and at the same time the quietest.

Statement Frank Weber Battery Cell Competence Center

Technology
·
Electrification
·
Corporate
·
Locations
03.05.2021

BMW Group Research and Development Center in China.

Technology
·
Locations
·
Corporate
05.12.2018

Future BMW Group Additive Manufacturing Campus (04/2018)

Locations
·
Corporate
·
Technology
·
Mobility of the future
16.04.2018

The BMW Group Virtual Factory.

Production, Recycling
·
Production Plants
·
Technology
·
Software Development
·
Locations
11.06.2025

BMW Group Virtual Factory. Collision checks for new vehicle models.

Production, Recycling
·
Production Plants
·
Technology
·
Software Development
·
Locations
11.06.2025

Round Cell Production in the BMW Group Cell Manufacturing Competence Center

Technology
·
Production, Recycling
·
Locations
·
Production Plants
10.09.2024

Autonomous, driverless transport vehicle navigates precisely through BMW Group Plant Regensburg press plant.

Locations
·
Production Plants
·
Technology
·
Production, Recycling
12.06.2024

The InnoLab at BMW Group Plant Steyr

Locations
·
Production Plants
·
Production, Recycling
·
Technology
06.02.2024

German men's biathlon team tests in the BMW Group wind tunnel.

Winter Sports
·
Acoustics, Aerodynamics
·
Technology
·
More Sports
14.11.2023

Round Cell Production in the BMW Group Cell Manufacturing Competence Center

Technology
·
Production, Recycling
·
Locations
·
Production Plants
26.10.2023

BMW i5 Production Plant Dingolfing

i5
·
BMW i
·
Locations
·
Production Plants
·
Production, Recycling
·
Technology
19.07.2023

Decarbonisation Properties Expert Statement Nicole Haft-Zboril

Corporate
·
Locations
13.07.2022
Statement Frank Weber Battery Cell Competence Center
 
Technology
·
Electrification
·
Corporate
·
Locations
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Frank Weber provides insights into the development of battery cells and sustainable manufacturing methods at the Battery Cell Competence Center in Munich.
Downloads.
03.05.2021 | ID: PF0008360
Statement Frank Weber Battery Cell Competence Center
Frank Weber provides insights into the development of battery cells and sustainable manufacturing methods at the Battery Cell Competence Center in Munich.
BMW Group Research and Development Center in China.
 
Technology
·
Locations
·
Corporate
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
05.12.2018 | ID: PF0006610
BMW Group Research and Development Center in China.
Future BMW Group Additive Manufacturing Campus (04/2018)
 
Locations
·
Corporate
·
Technology
·
Mobility of the future
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
16.04.2018 | ID: PF0005954
Future BMW Group Additive Manufacturing Campus (04/2018)
The BMW Group Virtual Factory.
 
Production, Recycling
·
Production Plants
·
Technology
·
Software Development
·
Locations
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The BMW Group is industrialising its Virtual Factory, with production planners continuously scaling applications in the digital twins of over 30 production sites to accelerate production planning worldwide. What once required several weeks of real-world modifications and testing can now be precisely simulated in the BMW Group's Virtual Factory.
Downloads.
11.06.2025 | ID: PF0010020
The BMW Group Virtual Factory.
The BMW Group is industrialising its Virtual Factory, with production planners continuously scaling applications in the digital twins of over 30 production sites to accelerate production planning worldwide. What once required several weeks of real-world modifications and testing can now be precisely simulated in the BMW Group's Virtual Factory.
BMW Group Virtual Factory. Collision checks for new vehicle models.
 
Production, Recycling
·
Production Plants
·
Technology
·
Software Development
·
Locations
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


For every launch, it is essential to verify that the new product fits on the production line and does not collide with its surroundings at any point. In the BMW Group's Virtual Factory, the collision check is digital, automated and fast, using construction data combined with 3D scans. The movement and rotation of a vehicle through the production lines are precisely simulated, allowing the system to automatically check for possible collisions. What now takes just three days to simulate virtually previously required almost four weeks of real testing.
Downloads.
11.06.2025 | ID: PF0010019
BMW Group Virtual Factory. Collision checks for new vehicle models.
For every launch, it is essential to verify that the new product fits on the production line and does not collide with its surroundings at any point. In the BMW Group's Virtual Factory, the collision check is digital, automated and fast, using construction data combined with 3D scans. The movement and rotation of a vehicle through the production lines are precisely simulated, allowing the system to automatically check for possible collisions. What now takes just three days to simulate virtually previously required almost four weeks of real testing.
Round Cell Production in the BMW Group Cell Manufacturing Competence Center
 
Technology
·
Production, Recycling
·
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Explanatory video of the round cell production (pilot line) in the CMCC in Parsdorf
Downloads.
10.09.2024 | ID: PF0009591
Round Cell Production in the BMW Group Cell Manufacturing Competence Center
Explanatory video of the round cell production (pilot line) in the CMCC in Parsdorf
Autonomous, driverless transport vehicle navigates precisely through BMW Group Plant Regensburg press plant.
 
Locations
·
Production Plants
·
Technology
·
Production, Recycling
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Autonomous, driverless transport vehicle navigates precisely through BMW Group Plant Regensburg press plant: With the introduction of an autonomous transport vehicle at its press plant, BMW Group Plant Regensburg is driving forward with digitalisation and automation of its manufacturing processes: The company is thus taking a further step towards the digital and intelligently connected BMW iFACTORY. The driverless platform truck, with its electric drive train, will handle the internal transport of press tools and steel blanks for the press lines autonomously, with a payload of up to 55 tonnes. Using state-of-the-art sensor technology, the transport system navigates accurately and fully autonomously through the production facilities of the Regensburg press plant at a speed of four kilometres per hour - without a driver. The solution is one of a kind and currently exists nowhere else in the world.
Downloads.
12.06.2024 | ID: PF0009726
Autonomous, driverless transport vehicle navigates precisely through BMW Group Plant Regensburg press plant.
Autonomous, driverless transport vehicle navigates precisely through BMW Group Plant Regensburg press plant: With the introduction of an autonomous transport vehicle at its press plant, BMW Group Plant Regensburg is driving forward with digitalisation and automation of its manufacturing processes: The company is thus taking a further step towards the digital and intelligently connected BMW iFACTORY. The driverless platform truck, with its electric drive train, will handle the internal transport of press tools and steel blanks for the press lines autonomously, with a payload of up to 55 tonnes. Using state-of-the-art sensor technology, the transport system navigates accurately and fully autonomously through the production facilities of the Regensburg press plant at a speed of four kilometres per hour - without a driver. The solution is one of a kind and currently exists nowhere else in the world.
The InnoLab at BMW Group Plant Steyr
 
Locations
·
Production Plants
·
Production, Recycling
·
Technology
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The film shows footage and employees of the InnoLab and the production at BMW Group Plant Steyr.
Downloads.
06.02.2024 | ID: PF0009643
The InnoLab at BMW Group Plant Steyr
The film shows footage and employees of the InnoLab and the production at BMW Group Plant Steyr.
German men's biathlon team tests in the BMW Group wind tunnel.
 
Winter Sports
·
Acoustics, Aerodynamics
·
Technology
·
More Sports
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


For the first time ever, the German National Biathlon Team was able to perform tests in a wind tunnel thanks to DSV Biathlon Mobility Partner BMW. In the different wind speeds and directions generated in the controlled laboratory conditions in the BMW Group's Aerolab, the DSV men were able to analyse their body posture, their reactions to different conditions, and the movement of their weapons when shooting whilst standing. This video contains a best-of the tests from various angles including quotes.
Downloads.
14.11.2023 | ID: PF0009606
German men's biathlon team tests in the BMW Group wind tunnel.
For the first time ever, the German National Biathlon Team was able to perform tests in a wind tunnel thanks to DSV Biathlon Mobility Partner BMW. In the different wind speeds and directions generated in the controlled laboratory conditions in the BMW Group's Aerolab, the DSV men were able to analyse their body posture, their reactions to different conditions, and the movement of their weapons when shooting whilst standing. This video contains a best-of the tests from various angles including quotes.
Round Cell Production in the BMW Group Cell Manufacturing Competence Center
 
Technology
·
Production, Recycling
·
Locations
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Explanatory video of the round cell production (pilot line) in the CMCC in Parsdorf
Downloads.
26.10.2023 | ID: PF0009592
Round Cell Production in the BMW Group Cell Manufacturing Competence Center
Explanatory video of the round cell production (pilot line) in the CMCC in Parsdorf
BMW i5 Production Plant Dingolfing
 
i5
·
BMW i
·
Locations
·
Production Plants
·
Production, Recycling
·
Technology
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Production - Front views with details, Engine with details, Side views with details, Rear views with details, Cockpit with details, Seats front and back with details
Downloads.
19.07.2023 | ID: PF0009484
BMW i5 Production Plant Dingolfing
Production - Front views with details, Engine with details, Side views with details, Rear views with details, Cockpit with details, Seats front and back with details
Decarbonisation Properties Expert Statement Nicole Haft-Zboril
 
Corporate
·
Locations
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Explanation of the goal and implementation of energy management at all our sites worldwide — on the road to decarbonization. Expert Nicole Haft-Zboril explains the objectives and tasks, explains practical applications and explains the benefits.
Downloads.
13.07.2022 | ID: PF0009476
Decarbonisation Properties Expert Statement Nicole Haft-Zboril
Explanation of the goal and implementation of energy management at all our sites worldwide — on the road to decarbonization. Expert Nicole Haft-Zboril explains the objectives and tasks, explains practical applications and explains the benefits.

Search Settings.

HighRes MOV
LowRes MPEG-4
LowRes MOV
LowRes FLV

Set publication time.

no Selection
  • no Selection
  • past 24 hours
  • past Week
  • past Month
  • past Year
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login