Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub México · Photo.

Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564428
Charging infrastructure partnership with VEMO

Charging infrastructure partnership with VEMO

Electrification
·
Tecnología
12.08.2024

Charging infrastructure partnership with VEMO

Electrification
·
Tecnología
12.08.2024

Charging infrastructure partnership with VEMO

Electrification
·
Tecnología
12.08.2024

Charging infrastructure partnership with VEMO

Electrification
·
Tecnología
12.08.2024

Charging infrastructure partnership with VEMO

Electrification
·
Tecnología
12.08.2024

Charging infrastructure partnership with VEMO

Electrification
·
Tecnología
12.08.2024

Charging infrastructure partnership with VEMO

Electrification
·
Tecnología
12.08.2024

Charging infrastructure partnership with VEMO

Electrification
·
Tecnología
12.08.2024

Charging infrastructure partnership with VEMO

Tecnología
·
Electrification
12.08.2024

BMW Group Plant Dingolfing 02.20 (07/2024)

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
31.07.2024

BMW Group Plant Dingolfing 02.20 (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plant Dingolfing
31.07.2024

BMW Group Plant Dingolfing 02.20 (07/2024)

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
31.07.2024

Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Motores, Drivetrain
31.07.2024

Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
31.07.2024

Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)

Producción, Reciclado
·
Tecnología
·
Electrification
·
Corporativo
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
31.07.2024

Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plant Dingolfing
31.07.2024

Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
31.07.2024

Markus Fallböhmer, Senior Vice President Battery Production, BMW AG (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
31.07.2024

Markus Fallböhmer, Senior Vice President Battery Production, BMW AG, in dialogue with an employee in Dingolfing (07/2024)

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
31.07.2024

Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Corporativo
·
Producción, Reciclado
·
Tecnología
·
Electrification
31.07.2024

Stefan Kasperowski, Vice President High-Voltage Battery production at Bavarian plants (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
31.07.2024

Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plant Dingolfing
31.07.2024

Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
31.07.2024

Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plant Dingolfing
31.07.2024

Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
30.07.2024

Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
China
30.07.2024

Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
30.07.2024

Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
USA
30.07.2024

BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)

Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
30.07.2024

Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).

Plantas de Producción
·
Plantas, Instalaciones
·
Tecnología
·
Producción, Reciclado
·
Electrification
30.07.2024

San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).

Producción, Reciclado
·
Tecnología
·
Electrification
·
Mexico
·
Plantas, Instalaciones
·
Plantas de Producción
30.07.2024

San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Mexico
30.07.2024

BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)

Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
30.07.2024

A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at nearby BMW Manufacturing in Spartanburg (06/2023).

Plantas de Producción
·
Plantas, Instalaciones
·
Tecnología
·
Electrification
24.06.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Corporativo
·
Tecnología
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Corporativo
·
Tecnología
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. From left to right: Hiroki Nakajima, Member of the Board of Directors, Executive Vice President; Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG; Frank Weber, Member of the Board of Management of BMW AG, Development (09/2024).

Corporativo
·
Tecnología
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Corporativo
·
Tecnología
05.09.2024

New functions, extensive updates for the My BMW App: Charging Wallet.

Tecnología
·
BMW ConnectedDrive
15.08.2024

New functions, extensive updates for the My BMW App: Route Criteria Sync.

Tecnología
·
BMW ConnectedDrive
15.08.2024
Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564436
Charging infrastructure partnership with VEMO
Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564433
Charging infrastructure partnership with VEMO
Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564429
Charging infrastructure partnership with VEMO
Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564421
Charging infrastructure partnership with VEMO
Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564420
Charging infrastructure partnership with VEMO
Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564419
Charging infrastructure partnership with VEMO
Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564416
Charging infrastructure partnership with VEMO
Charging infrastructure partnership with VEMO
Electrification
·
Tecnología
 
Downloads.
12.08.2024 | ID: P90564414
Charging infrastructure partnership with VEMO
Charging infrastructure partnership with VEMO
Tecnología
·
Electrification
 
Downloads.
12.08.2024 | ID: P90564400
Charging infrastructure partnership with VEMO
BMW Group Plant Dingolfing 02.20 (07/2024)
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559477
BMW Group Plant Dingolfing 02.20 (07/2024)
BMW Group Plant Dingolfing 02.20 (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559476
BMW Group Plant Dingolfing 02.20 (07/2024)
BMW Group Plant Dingolfing 02.20 (07/2024)
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559475
BMW Group Plant Dingolfing 02.20 (07/2024)
Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Motores, Drivetrain
 
Downloads.
31.07.2024 | ID: P90559474
Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559470
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Producción, Reciclado
·
Tecnología
·
Electrification
·
Corporativo
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559466
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559465
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559464
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Markus Fallböhmer, Senior Vice President Battery Production, BMW AG (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
 
Downloads.
31.07.2024 | ID: P90559463
Markus Fallböhmer, Senior Vice President Battery Production, BMW AG (07/2024)
Markus Fallböhmer, Senior Vice President Battery Production, BMW AG, in dialogue with an employee in Dingolfing (07/2024)
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
 
Downloads.
31.07.2024 | ID: P90559462
Markus Fallböhmer, Senior Vice President Battery Production, BMW AG, in dialogue with an employee in Dingolfing (07/2024)
Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Corporativo
·
Producción, Reciclado
·
Tecnología
·
Electrification
 
Downloads.
31.07.2024 | ID: P90559461
Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)
Stefan Kasperowski, Vice President High-Voltage Battery production at Bavarian plants (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
 
Downloads.
31.07.2024 | ID: P90559460
Stefan Kasperowski, Vice President High-Voltage Battery production at Bavarian plants (07/2024)
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559469
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
 
Downloads.
31.07.2024 | ID: P90559468
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plant Dingolfing
 
Downloads.
31.07.2024 | ID: P90559467
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
 
Downloads.
30.07.2024 | ID: P90562814
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
China
 
Downloads.
30.07.2024 | ID: P90562818
Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562808
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
·
USA
 
Downloads.
30.07.2024 | ID: P90562644
Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Producción, Reciclado
·
Tecnología
·
Electrification
·
Plantas, Instalaciones
·
Plantas de Producción
 
Downloads.
30.07.2024 | ID: P90562429
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).
Plantas de Producción
·
Plantas, Instalaciones
·
Tecnología
·
Producción, Reciclado
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562881
Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
Producción, Reciclado
·
Tecnología
·
Electrification
·
Mexico
·
Plantas, Instalaciones
·
Plantas de Producción
 
Downloads.
30.07.2024 | ID: P90562807
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
·
Mexico
 
Downloads.
30.07.2024 | ID: P90562706
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Plantas, Instalaciones
·
Plantas de Producción
·
Producción, Reciclado
·
Tecnología
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562428
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at ...
Plantas de Producción
·
Plantas, Instalaciones
·
Tecnología
·
Electrification
 
Downloads.
24.06.2024 | ID: P90512747
A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at nearby BMW Manufacturing in Spartanburg (06/2023).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Corporativo
·
Tecnología
 
Downloads.
05.09.2024 | ID: P90566386
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Corporativo
·
Tecnología
 
Downloads.
05.09.2024 | ID: P90566388
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Corporativo
·
Tecnología
 
Downloads.
05.09.2024 | ID: P90566387
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. From left to right: Hiroki Nakajima, Member of the Board of Directors, Executive Vice President; Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG; Frank Weber, Member of the Board of Management of BMW AG, Development (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Corporativo
·
Tecnología
 
Downloads.
05.09.2024 | ID: P90566389
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
New functions, extensive updates for the My BMW App: Charging Wallet.
Tecnología
·
BMW ConnectedDrive
 
Downloads.
15.08.2024 | ID: P90563733
New functions, extensive updates for the My BMW App: Charging Wallet.
New functions, extensive updates for the My BMW App: Route Criteria Sync.
Tecnología
·
BMW ConnectedDrive
 
Downloads.
15.08.2024 | ID: P90563730
New functions, extensive updates for the My BMW App: Route Criteria Sync.

Change Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login