An associate integrates the charging cable into the door sill of a vehicle (08/2019).
Powiązane artykuły
Milan Nedeljković, Board Member for Production at BMW AG, at the groundbreaking High Voltage Battery Assembly BMW Group Plant Rayong, Thailand (03/2024).
Milan Nedeljković, Board Member for Production at BMW AG, at the groundbreaking High Voltage Battery Assembly BMW Group Plant Rayong, Thailand (03/2024).