Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Belux · Article.

Eerste Neue Klasse testwagens rollen van de band in BMW Group Fabriek Debrecen

+++ BMW Group fabriek Debrecen in Hongarije maakt zich klaar voor de start van serieproductie eind volgend jaar +++ Eerste testwagens geproduceerd voor volledig elektrisch Neue Klasse X model +++

iFactory
·
Neue Klasse
·
Technologie, Onderzoek & Ontwikkeling
·
Productie, Recycling
·
Electrification
 

Press Contact.

Jeroen Lissens
BMW Group

Tel: +32-3-890-9708

send an e-mail

Author.

Moritz Schmerbeck
BMW Group

Other Languages.

Related Links.

+++ BMW Group fabriek Debrecen in Hongarije maakt zich klaar voor de start van serieproductie eind volgend jaar +++ Eerste testwagens geproduceerd voor volledig elektrisch Neue Klasse X model +++

//

Debrecen. BMW Group Plant Debrecen in Hungary is shifting into first gear: Production of test vehicles is ramping up and the first near-series fully-electric X models for the Neue Klasse are now leaving the production line.* This marks the beginning of the final preparation phase for the start of series production in late 2025.

“The production of the first test vehicles in Debrecen is an important milestone in commissioning the new plant,” says Milan Nedeljković, member of the Board of Management of BMW AG responsible for Production. With vehicles now approaching series maturity, all logistics and production processes at the plant are being tested and constantly optimised under real conditions to ensure a smooth start of series production.

On the road to series production

The integration of new models in a plant starts with the production of near-series vehicles – an important step for the preparation of series production in Debrecen. As part of this process, test vehicles cycle through all production steps. This also means that all logistics processes, manufacturing equipment and operations performed by employees at the plant already have to function smoothly. These operations are just as complex as in actual series production. Despite the limited number of parts involved, they must still be made available in the appropriate logistics processes.

Materials and vehicle parts are delivered daily to Plant Debrecen, with test vehicles coming off the production line on a continuous basis. Every part and every production step is closely scrutinised. Special attention is paid to validation of cutting-edge production systems and tools, including their digital connectivity.

Running system tests for the future vehicle model helps identify further potential for optimisation. In the coming months, the focus will be on refining processes, based on the insights gained.

During this phase, new staff will also undergo intensive training on the installations and machinery. Close cooperation across all areas of production will ensure operations are seamlessly integrated for a smooth and successful series launch.

 

*Since this is a pre-production model, consumption data for the X model of the Neue Klasse is not available at this time.

Article Offline Attachments.

Article Media Material.

My.PressClub Inloggen

PressClub Streaming

JAPAN MOBILITY SHOW.

Click here

Here you can see the webcast of the BMW Group Keynote at the Japan Mobility Show 2025. 

Search Settings.

Persbericht
Persmap
Toespraak
Fact & Figures

Search with attachment language.

Nederlands
  • Taal van bestandsbijlage
  • Amerikaans-Engels
  • Arabisch
  • Duits
  • Engels
  • Frans
  • Nederlands
Updates
Top-Topic

Set publication time.

no Selection
  • no Selection
  • past 24 hours
  • past Week
  • past Month
  • past Year
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Inloggen