Do you need help? Please contact our support team from 9 to 17 CET via
support.pressclub@bmwgroup.com.
A building with history: Once intended as reprocessing facility, “hall 80” now symbolizes Wackersdorf site’s electric future. (09/2023)
Downloads.
28.09.2023 | ID: P90524672
A building with history: Once intended as reprocessing facility, “hall 80” now symbolizes Wackersdorf site’s electric future. (09/2023)