Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Belux · Photo.

MINI Countryman production at BMW Group Plant Leipzig (11/2023)
Technologie
·
Production, recyclage
·
Usines, installations
·
Usines de production
 
Downloads.
10.11.2023 | ID: P90531626
MINI Countryman production at BMW Group Plant Leipzig (11/2023)

Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).

Production, recyclage
·
Technologie
·
Electrification
·
Usines, installations
·
Usines de production
30.07.2024

Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).

Production, recyclage
·
Technologie
·
Electrification
·
Usines, installations
·
Usines de production
·
China
30.07.2024

Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).

Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
·
Electrification
30.07.2024

Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).

Production, recyclage
·
Technologie
·
Electrification
·
Usines, installations
·
Usines de production
·
USA
30.07.2024

BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)

Production, recyclage
·
Technologie
·
Electrification
·
Usines, installations
·
Usines de production
30.07.2024

Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).

Usines de production
·
Usines, installations
·
Technologie
·
Production, recyclage
·
Electrification
30.07.2024

San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).

Production, recyclage
·
Technologie
·
Electrification
·
Mexico
·
Usines, installations
·
Usines de production
30.07.2024

San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).

Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
·
Electrification
·
Mexico
30.07.2024

BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)

Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
·
Electrification
30.07.2024

A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at nearby BMW Manufacturing in Spartanburg (06/2023).

Usines de production
·
Usines, installations
·
Technologie
·
Electrification
29.07.2024

Rendering of the future high-voltage battery assembly in Shenyang. The blue highlighted structures are the new project buildings (05/23)

Usines, installations
·
Usines de production
·
Technologie
·
Electrification
·
China
·
Entreprise
·
BMW i
29.07.2024

Preliminary visualization for the new BMW Group production site for high-voltage batteries in Irlbach-Strasskirchen. (06/2024)

Usines, installations
·
Usines de production
29.07.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Corporate
·
Technologie
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Corporate
·
Technologie
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. From left to right: Hiroki Nakajima, Member of the Board of Directors, Executive Vice President; Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG; Frank Weber, Member of the Board of Management of BMW AG, Development (09/2024).

Corporate
·
Technologie
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Corporate
·
Technologie
05.09.2024

BMW X3 30e xDrive. (06/2024)

G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
18.06.2024

BMW X3 30e xDrive. (06/2024)

G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
18.06.2024

BMW X3 M50 xDrive. (06/2024)

G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
18.06.2024

BMW X3 M50 xDrive. (06/2024)

G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
18.06.2024

BMW X3 20 xDrive. (06/2024)

Technologie
·
Moteurs, chaîne cinématique
18.06.2024

BMW X3 20 xDrive. (06/2024)

G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
18.06.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024

GS Trophy 2024 Day 1 (09/2024)

Formation du pilote, voyage, événements
16.09.2024
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Production, recyclage
·
Technologie
·
Electrification
·
Usines, installations
·
Usines de production
 
Downloads.
30.07.2024 | ID: P90562814
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).
Production, recyclage
·
Technologie
·
Electrification
·
Usines, installations
·
Usines de production
·
China
 
Downloads.
30.07.2024 | ID: P90562818
Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562808
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).
Production, recyclage
·
Technologie
·
Electrification
·
Usines, installations
·
Usines de production
·
USA
 
Downloads.
30.07.2024 | ID: P90562644
Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Production, recyclage
·
Technologie
·
Electrification
·
Usines, installations
·
Usines de production
 
Downloads.
30.07.2024 | ID: P90562429
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).
Usines de production
·
Usines, installations
·
Technologie
·
Production, recyclage
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562881
Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
Production, recyclage
·
Technologie
·
Electrification
·
Mexico
·
Usines, installations
·
Usines de production
 
Downloads.
30.07.2024 | ID: P90562807
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
·
Electrification
·
Mexico
 
Downloads.
30.07.2024 | ID: P90562706
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562428
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at ...
Usines de production
·
Usines, installations
·
Technologie
·
Electrification
 
Downloads.
29.07.2024 | ID: P90512747
A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at nearby BMW Manufacturing in Spartanburg (06/2023).
Rendering of the future high-voltage battery assembly in Shenyang. The blue highlighted structures are the new project buildings (05/23)
Usines, installations
·
Usines de production
·
Technologie
·
Electrification
·
China
·
Entreprise
·
BMW i
 
Downloads.
29.07.2024 | ID: P90505699
Rendering of the future high-voltage battery assembly in Shenyang. The blue highlighted structures are the new project buildings (05/23)
Preliminary visualization for the new BMW Group production site for high-voltage batteries in Irlbach-Strasskirchen. (06/2024)
Usines, installations
·
Usines de production
 
Downloads.
29.07.2024 | ID: P90557645
Preliminary visualization for the new BMW Group production site for high-voltage batteries in Irlbach-Strasskirchen. (06/2024)
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Corporate
·
Technologie
 
Downloads.
05.09.2024 | ID: P90566386
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Corporate
·
Technologie
 
Downloads.
05.09.2024 | ID: P90566388
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Corporate
·
Technologie
 
Downloads.
05.09.2024 | ID: P90566387
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. From left to right: Hiroki Nakajima, Member of the Board of Directors, Executive Vice President; Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG; Frank Weber, Member of the Board of Management of BMW AG, Development (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Corporate
·
Technologie
 
Downloads.
05.09.2024 | ID: P90566389
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
BMW X3 30e xDrive. (06/2024)
G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
 
Downloads.
18.06.2024 | ID: P90554384
BMW X3 30e xDrive. (06/2024)
BMW X3 30e xDrive. (06/2024)
G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
 
Downloads.
18.06.2024 | ID: P90554383
BMW X3 30e xDrive. (06/2024)
BMW X3 M50 xDrive. (06/2024)
G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
 
Downloads.
18.06.2024 | ID: P90554382
BMW X3 M50 xDrive. (06/2024)
BMW X3 M50 xDrive. (06/2024)
G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
 
Downloads.
18.06.2024 | ID: P90554381
BMW X3 M50 xDrive. (06/2024)
BMW X3 20 xDrive. (06/2024)
Technologie
·
Moteurs, chaîne cinématique
 
Downloads.
18.06.2024 | ID: P90554499
BMW X3 20 xDrive. (06/2024)
BMW X3 20 xDrive. (06/2024)
G45
·
Technologie
·
Moteurs, chaîne cinématique
·
X3
 
Downloads.
18.06.2024 | ID: P90554498
BMW X3 20 xDrive. (06/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568729
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568728
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568727
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568726
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568725
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568724
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568723
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568722
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568721
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568720
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568719
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568718
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568717
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568716
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568715
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568714
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568713
GS Trophy 2024 Day 1 (09/2024)
GS Trophy 2024 Day 1 (09/2024)
Formation du pilote, voyage, événements
 
Downloads.
16.09.2024 | ID: P90568712
GS Trophy 2024 Day 1 (09/2024)

Change Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login