Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Belux · Photo.

MINI Countryman production at BMW Group Plant Leipzig (11/2023)
Technologie
·
Productie, Recycling
·
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
10.11.2023 | ID: P90531635
MINI Countryman production at BMW Group Plant Leipzig (11/2023)

Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).

Productie, Recycling
·
Technologie
·
Electrification
·
Vestigingen, Filialen
·
Productievestigingen
30.07.2024

Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).

Productie, Recycling
·
Technologie
·
Electrification
·
Vestigingen, Filialen
·
Productievestigingen
·
China
30.07.2024

Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).

Vestigingen, Filialen
·
Productievestigingen
·
Productie, Recycling
·
Technologie
·
Electrification
30.07.2024

Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).

Productie, Recycling
·
Technologie
·
Electrification
·
Vestigingen, Filialen
·
Productievestigingen
·
USA
30.07.2024

BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)

Productie, Recycling
·
Technologie
·
Electrification
·
Vestigingen, Filialen
·
Productievestigingen
30.07.2024

Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).

Productievestigingen
·
Vestigingen, Filialen
·
Technologie
·
Productie, Recycling
·
Electrification
30.07.2024

San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).

Productie, Recycling
·
Technologie
·
Electrification
·
Mexico
·
Vestigingen, Filialen
·
Productievestigingen
30.07.2024

San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).

Vestigingen, Filialen
·
Productievestigingen
·
Productie, Recycling
·
Technologie
·
Electrification
·
Mexico
30.07.2024

BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)

Vestigingen, Filialen
·
Productievestigingen
·
Productie, Recycling
·
Technologie
·
Electrification
30.07.2024

A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at nearby BMW Manufacturing in Spartanburg (06/2023).

Productievestigingen
·
Vestigingen, Filialen
·
Technologie
·
Electrification
29.07.2024

Rendering of the future high-voltage battery assembly in Shenyang. The blue highlighted structures are the new project buildings (05/23)

Vestigingen, Filialen
·
Productievestigingen
·
Technologie
·
Electrification
·
China
·
Onderneming
·
BMW i
29.07.2024

BMW Group Plant Steyr at the Austrian World Summit 2024 (06/2024)

Bedrijf
·
Bedrijfsevenementen
·
Vestigingen, Filialen
·
Productievestigingen
18.09.2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Milieu
·
Duurzaamheid
·
Vestigingen, Filialen
·
Productievestigingen
18.09.2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Milieu
·
Duurzaamheid
·
Vestigingen, Filialen
·
Productievestigingen
18.09.2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy Manager of the BMW Group Plant Steyr, Tanja Hornbachner (10/2023)

Milieu
·
Duurzaamheid
·
Vestigingen, Filialen
·
Productievestigingen
·
Mensen
·
Meer Mensen bij BMW Group
18.09.2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Milieu
·
Duurzaamheid
·
Vestigingen, Filialen
·
Productievestigingen
18.09.2024

Preliminary visualization for the new BMW Group production site for high-voltage batteries in Irlbach-Strasskirchen. (06/2024)

Vestigingen, Filialen
·
Productievestigingen
29.07.2024

World’s #1 card game UNO as new BMW in-car gaming experience

Technologie
·
BMW ConnectedDrive
·
Infotainment, Bedieningsconcepten
25.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Bedrijf
·
Technologie
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Bedrijf
·
Technologie
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. From left to right: Hiroki Nakajima, Member of the Board of Directors, Executive Vice President; Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG; Frank Weber, Member of the Board of Management of BMW AG, Development (09/2024).

Bedrijf
·
Technologie
05.09.2024

Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).

Bedrijf
·
Technologie
05.09.2024

BMW X3 30e xDrive. (06/2024)

G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
18.06.2024

BMW X3 30e xDrive. (06/2024)

G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
18.06.2024

BMW X3 M50 xDrive. (06/2024)

G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
18.06.2024

BMW X3 M50 xDrive. (06/2024)

G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
18.06.2024

BMW X3 20 xDrive. (06/2024)

Technologie
·
Motoren, Aandrijflijn
18.06.2024

BMW X3 20 xDrive. (06/2024)

G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
18.06.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

MINI Belux x PwC (10/2024)

Bedrijf
·
Sales en Marketing
01.10.2024

Klaus von Moltke, Plant Manager BMW Group Plant Steyr (06/2024)

Mensen
·
Meer Mensen bij BMW Group
·
Corporate Heritage
·
Heritage
18.09.2024
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Productie, Recycling
·
Technologie
·
Electrification
·
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
30.07.2024 | ID: P90562814
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).
Productie, Recycling
·
Technologie
·
Electrification
·
Vestigingen, Filialen
·
Productievestigingen
·
China
 
Downloads.
30.07.2024 | ID: P90562818
Shenyang (China): The sixth-generation high-voltage batteries will be manufactured locally in Shenyang, too (07/2024).
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Vestigingen, Filialen
·
Productievestigingen
·
Productie, Recycling
·
Technologie
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562808
Irlbach-Straßkirchen (Germany): This new facility will supply sixth-generation high-voltage batteries to German car plants (07/2024).
Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).
Productie, Recycling
·
Technologie
·
Electrification
·
Vestigingen, Filialen
·
Productievestigingen
·
USA
 
Downloads.
30.07.2024 | ID: P90562644
Woodruff (USA): Here, the high-voltage batteries for the nearby Plant Spartanburg are assembled (07/2024).
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Productie, Recycling
·
Technologie
·
Electrification
·
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
30.07.2024 | ID: P90562429
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).
Productievestigingen
·
Vestigingen, Filialen
·
Technologie
·
Productie, Recycling
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562881
Debrecen (Hungary): In 2025, the first Neue Klasse vehicles will roll of the production line at the BMW Group Plant Debrecen (07/2024).
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
Productie, Recycling
·
Technologie
·
Electrification
·
Mexico
·
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
30.07.2024 | ID: P90562807
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
Vestigingen, Filialen
·
Productievestigingen
·
Productie, Recycling
·
Technologie
·
Electrification
·
Mexico
 
Downloads.
30.07.2024 | ID: P90562706
San Luis Potosí (Mexico): Construction of the new high-voltage battery assembly plant started in May 2024 (07/2024).
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Vestigingen, Filialen
·
Productievestigingen
·
Productie, Recycling
·
Technologie
·
Electrification
 
Downloads.
30.07.2024 | ID: P90562428
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at ...
Productievestigingen
·
Vestigingen, Filialen
·
Technologie
·
Electrification
 
Downloads.
29.07.2024 | ID: P90512747
A visualization of the BMW Group Plant Woodruff. Here, high-voltage batteries will be produced to supply the production of fully electric vehicles at nearby BMW Manufacturing in Spartanburg (06/2023).
Rendering of the future high-voltage battery assembly in Shenyang. The blue highlighted structures are the new project buildings (05/23)
Vestigingen, Filialen
·
Productievestigingen
·
Technologie
·
Electrification
·
China
·
Onderneming
·
BMW i
 
Downloads.
29.07.2024 | ID: P90505699
Rendering of the future high-voltage battery assembly in Shenyang. The blue highlighted structures are the new project buildings (05/23)
BMW Group Plant Steyr at the Austrian World Summit 2024 (06/2024)
Bedrijf
·
Bedrijfsevenementen
·
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
18.09.2024 | ID: P90557144
BMW Group Plant Steyr at the Austrian World Summit 2024 (06/2024)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Milieu
·
Duurzaamheid
·
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
18.09.2024 | ID: P90527373
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Milieu
·
Duurzaamheid
·
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
18.09.2024 | ID: P90527372
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy ...
Milieu
·
Duurzaamheid
·
Vestigingen, Filialen
·
Productievestigingen
·
Mensen
·
Meer Mensen bij BMW Group
 
Downloads.
18.09.2024 | ID: P90527371
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy Manager of the BMW Group Plant Steyr, Tanja Hornbachner (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Milieu
·
Duurzaamheid
·
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
18.09.2024 | ID: P90527370
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Preliminary visualization for the new BMW Group production site for high-voltage batteries in Irlbach-Strasskirchen. (06/2024)
Vestigingen, Filialen
·
Productievestigingen
 
Downloads.
29.07.2024 | ID: P90557645
Preliminary visualization for the new BMW Group production site for high-voltage batteries in Irlbach-Strasskirchen. (06/2024)
World’s #1 card game UNO as new BMW in-car gaming experience
Technologie
·
BMW ConnectedDrive
·
Infotainment, Bedieningsconcepten
 
Downloads.
25.09.2024 | ID: P90563126
World’s #1 card game UNO as new BMW in-car gaming experience
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Bedrijf
·
Technologie
 
Downloads.
05.09.2024 | ID: P90566386
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Bedrijf
·
Technologie
 
Downloads.
05.09.2024 | ID: P90566388
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Bedrijf
·
Technologie
 
Downloads.
05.09.2024 | ID: P90566387
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. From left to right: Hiroki Nakajima, Member of the Board of Directors, Executive Vice President; Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG; Frank Weber, Member of the Board of Management of BMW AG, Development (09/2024).
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for ...
Bedrijf
·
Technologie
 
Downloads.
05.09.2024 | ID: P90566389
Hydrogen Pioneers: BMW Group and Toyota Motor Corporation take collaboration to the next level to offer Fuel Cell Electric Vehicle (FCEV) options for passenger cars. Koji Sato, President and Member of the Board of Management (Representative Director) Toyota Motor Corporation; Oliver Zipse, Chairman of the Board of Management of BMW AG (09/2024).
BMW X3 30e xDrive. (06/2024)
G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
 
Downloads.
18.06.2024 | ID: P90554384
BMW X3 30e xDrive. (06/2024)
BMW X3 30e xDrive. (06/2024)
G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
 
Downloads.
18.06.2024 | ID: P90554383
BMW X3 30e xDrive. (06/2024)
BMW X3 M50 xDrive. (06/2024)
G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
 
Downloads.
18.06.2024 | ID: P90554382
BMW X3 M50 xDrive. (06/2024)
BMW X3 M50 xDrive. (06/2024)
G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
 
Downloads.
18.06.2024 | ID: P90554381
BMW X3 M50 xDrive. (06/2024)
BMW X3 20 xDrive. (06/2024)
Technologie
·
Motoren, Aandrijflijn
 
Downloads.
18.06.2024 | ID: P90554499
BMW X3 20 xDrive. (06/2024)
BMW X3 20 xDrive. (06/2024)
G45
·
Technologie
·
Motoren, Aandrijflijn
·
X3
 
Downloads.
18.06.2024 | ID: P90554498
BMW X3 20 xDrive. (06/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571559
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571558
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571557
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571556
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571555
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571554
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571553
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571552
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571551
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571550
MINI Belux x PwC (10/2024)
MINI Belux x PwC (10/2024)
Bedrijf
·
Sales en Marketing
 
Downloads.
01.10.2024 | ID: P90571549
MINI Belux x PwC (10/2024)
Klaus von Moltke, Plant Manager BMW Group Plant Steyr (06/2024)
Mensen
·
Meer Mensen bij BMW Group
·
Corporate Heritage
·
Heritage
 
Downloads.
18.09.2024 | ID: P90555711
Klaus von Moltke, Plant Manager BMW Group Plant Steyr (06/2024)

Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Inloggen