Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Belux · Photo.

BMW Group Plant SLP - Battery Module Production Center (04/2024)
Usines, installations
·
Usines de production
 
Downloads.
Thu May 02 13:18:02 CEST 2024 | ID: P90548427
BMW Group Plant SLP - Battery Module Production Center (04/2024)

New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)

Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
Fri Nov 01 08:00:00 CET 2024

New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)

Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
Fri Nov 01 08:00:00 CET 2024

All four models from the BMW Group plant in Leipzig (from left): BMW 2 Series Gran Coupé, BMW 1 Series, BMW 2 Series Active Tourer, MINI Countryman (11/2024)

Usines, installations
·
Usines de production
Fri Nov 01 08:00:00 CET 2024

BMW Group Plant Regensburg: Assembly line, finish (10/2024)

Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg – Production (10/2024)

Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg – Production (10/2024)

Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg – Production (10/2024)

Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg – Aerial View (10/2024)

Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg – Aerial View (10/2024)

Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
Thu Oct 24 11:05:09 CEST 2024

Photovoltaic roof at BMW Group plant Dingolfing (10/2024)

Usines, installations
·
Usines de production
·
Développement durable
·
Milieu
Mon Oct 21 10:43:45 CEST 2024

BMW Motorrad presents the BMW Concept F 450 GS.

Design, concepts, études
Tue Nov 05 11:30:00 CET 2024

BMW Motorrad presents the BMW Concept F 450 GS.

Design, concepts, études
Tue Nov 05 11:30:00 CET 2024

BMW Motorrad presents the BMW Concept F 450 GS.

Design, concepts, études
Tue Nov 05 11:30:00 CET 2024

BMW Motorrad presents the BMW Concept F 450 GS.

Design, concepts, études
Tue Nov 05 11:30:00 CET 2024
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577448
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577447
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577444
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577443
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577442
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577441
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577440
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577438
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577437
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577435
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577434
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577433
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577432
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577431
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577430
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577429
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577428
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
All four models from the BMW Group plant in Leipzig (from left): BMW 2 Series Gran Coupé, BMW 1 Series, BMW 2 Series Active Tourer, MINI Countryman ...
Usines, installations
·
Usines de production
 
Downloads.
Fri Nov 01 08:00:00 CET 2024 | ID: P90577427
All four models from the BMW Group plant in Leipzig (from left): BMW 2 Series Gran Coupé, BMW 1 Series, BMW 2 Series Active Tourer, MINI Countryman (11/2024)
BMW Group Plant Regensburg: Assembly line, finish (10/2024)
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571989
BMW Group Plant Regensburg: Assembly line, finish (10/2024)
BMW Group Plant Regensburg – Production (10/2024)
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571988
BMW Group Plant Regensburg – Production (10/2024)
BMW Group Plant Regensburg – Production (10/2024)
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571987
BMW Group Plant Regensburg – Production (10/2024)
BMW Group Plant Regensburg – Production (10/2024)
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571986
BMW Group Plant Regensburg – Production (10/2024)
BMW Group Plant Regensburg – Aerial View (10/2024)
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571985
BMW Group Plant Regensburg – Aerial View (10/2024)
BMW Group Plant Regensburg – Aerial View (10/2024)
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571984
BMW Group Plant Regensburg – Aerial View (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571983
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571982
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571981
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571980
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571979
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Usines de production
·
Usines, installations
·
BMW iX2
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571978
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571977
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571976
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571975
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571974
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Usines de production
·
Usines, installations
 
Downloads.
Thu Oct 24 11:05:09 CEST 2024 | ID: P90571973
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
Photovoltaic roof at BMW Group plant Dingolfing (10/2024)
Usines, installations
·
Usines de production
·
Développement durable
·
Milieu
 
Downloads.
Mon Oct 21 10:43:45 CEST 2024 | ID: P90574024
Photovoltaic roof at BMW Group plant Dingolfing (10/2024)
BMW Motorrad presents the BMW Concept F 450 GS.
Design, concepts, études
 
Downloads.
Tue Nov 05 11:30:00 CET 2024 | ID: P90577284
BMW Motorrad presents the BMW Concept F 450 GS.
BMW Motorrad presents the BMW Concept F 450 GS.
Design, concepts, études
 
Downloads.
Tue Nov 05 11:30:00 CET 2024 | ID: P90577283
BMW Motorrad presents the BMW Concept F 450 GS.
BMW Motorrad presents the BMW Concept F 450 GS.
Design, concepts, études
 
Downloads.
Tue Nov 05 11:30:00 CET 2024 | ID: P90577282
BMW Motorrad presents the BMW Concept F 450 GS.
BMW Motorrad presents the BMW Concept F 450 GS.
Design, concepts, études
 
Downloads.
Tue Nov 05 11:30:00 CET 2024 | ID: P90577281
BMW Motorrad presents the BMW Concept F 450 GS.

Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login