Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Belux · Photo.

New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
 
Downloads.
01.11.2024 | ID: P90577448
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)

Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)

Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
·
Electrification
·
Moteurs, chaîne cinématique
03.12.2024

The direct recycling project team at the BMW Group and its joint venture Encory (11/2024).

Usines de production
·
Usines, installations
·
Développement durable
·
Corporate
·
Technologie
·
Production, recyclage
·
Electrification
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

Usines, installations
·
Corporate
·
Développement durable
·
Technologie
·
Production, recyclage
·
Electrification
·
Usines de production
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

Technologie
·
Production, recyclage
·
Electrification
·
Usines de production
·
Usines, installations
·
Développement durable
·
Corporate
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

Développement durable
·
Corporate
·
Usines de production
·
Usines, installations
·
Technologie
·
Electrification
·
Production, recyclage
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

Technologie
·
Production, recyclage
·
Electrification
·
Usines de production
·
Usines, installations
·
Développement durable
·
Corporate
27.11.2024

Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).

Développement durable
·
Corporate
·
Technologie
·
Production, recyclage
·
Usines de production
·
Usines, installations
·
Electrification
27.11.2024

Preliminary visualization of the Cell Recycling Competence Centre (CRCC) for battery cells in Kirchroth (11/2024).

Usines de production
·
Usines, installations
·
Technologie
·
Production, recyclage
·
Electrification
·
Développement durable
·
Corporate
27.11.2024

The new BMW Group Plant Debrecen in Hungary (11/2024).

Usines de production
·
Usines, installations
·
Technologie
·
Production, recyclage
20.11.2024

The new BMW Group Plant Debrecen in Hungary (11/2024).

Technologie
·
Production, recyclage
·
Usines de production
·
Usines, installations
20.11.2024

New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)

Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
01.11.2024

Pre-series Gen6 electric motor for Neue Klasse test vehicles (11/2024)

Moteurs, chaîne cinématique
·
Technologie
·
Usines, installations
·
Usines de production
03.12.2024

Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Dingolfing, test track (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Dingolfing, LIDAR-Sensor (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).

Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
25.11.2024

The newly built assembly hall for electric motors at the BMW Group plant in Steyr (09/2024)

Usines, installations
·
Usines de production
03.12.2024

Helmut Hochsteiner, Head of the Electric Drive Machine division at BMW Group Plant Steyr (01/2024)

Usines de production
·
Usines, installations
·
Autres personnes au sein du BMW Group
·
Personnes
03.12.2024

BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)

Usines, installations
·
Usines de production
25.11.2024

BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)

Usines, installations
·
Usines de production
25.11.2024

BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)

Usines, installations
·
Usines de production
25.11.2024

BMW Group Plant Wackersdorf, battery test center (10/2024)

Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
19.11.2024

BMW Group Plant Wackersdorf, battery test center (10/2024)

Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
19.11.2024

BMW Group Plant Wackersdorf, battery test center – Dr. Felix Schmidt-Stein (project head) (10/2024)

Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
19.11.2024

BMW Group Plant Wackersdorf, battery test center (10/2024)

Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
19.11.2024

BMW Group Plant Wackersdorf, battery test center (10/2024)

Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
19.11.2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
01.11.2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
01.11.2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
01.11.2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
01.11.2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
01.11.2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
01.11.2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
01.11.2024
Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)
Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
·
Electrification
·
Moteurs, chaîne cinématique
 
Downloads.
03.12.2024 | ID: P90559474
Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)
The direct recycling project team at the BMW Group and its joint venture Encory (11/2024).
Usines de production
·
Usines, installations
·
Développement durable
·
Corporate
·
Technologie
·
Production, recyclage
·
Electrification
 
Downloads.
27.11.2024 | ID: P90581209
The direct recycling project team at the BMW Group and its joint venture Encory (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Usines, installations
·
Corporate
·
Développement durable
·
Technologie
·
Production, recyclage
·
Electrification
·
Usines de production
 
Downloads.
27.11.2024 | ID: P90581208
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Technologie
·
Production, recyclage
·
Electrification
·
Usines de production
·
Usines, installations
·
Développement durable
·
Corporate
 
Downloads.
27.11.2024 | ID: P90581207
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Développement durable
·
Corporate
·
Usines de production
·
Usines, installations
·
Technologie
·
Electrification
·
Production, recyclage
 
Downloads.
27.11.2024 | ID: P90581206
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Technologie
·
Production, recyclage
·
Electrification
·
Usines de production
·
Usines, installations
·
Développement durable
·
Corporate
 
Downloads.
27.11.2024 | ID: P90581205
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Développement durable
·
Corporate
·
Technologie
·
Production, recyclage
·
Usines de production
·
Usines, installations
·
Electrification
 
Downloads.
27.11.2024 | ID: P90581204
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024).
Preliminary visualization of the Cell Recycling Competence Centre (CRCC) for battery cells in Kirchroth (11/2024).
Usines de production
·
Usines, installations
·
Technologie
·
Production, recyclage
·
Electrification
·
Développement durable
·
Corporate
 
Downloads.
27.11.2024 | ID: P90581203
Preliminary visualization of the Cell Recycling Competence Centre (CRCC) for battery cells in Kirchroth (11/2024).
The new BMW Group Plant Debrecen in Hungary (11/2024).
Usines de production
·
Usines, installations
·
Technologie
·
Production, recyclage
 
Downloads.
20.11.2024 | ID: P90580602
The new BMW Group Plant Debrecen in Hungary (11/2024).
The new BMW Group Plant Debrecen in Hungary (11/2024).
Technologie
·
Production, recyclage
·
Usines de production
·
Usines, installations
 
Downloads.
20.11.2024 | ID: P90580601
The new BMW Group Plant Debrecen in Hungary (11/2024).
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
Usines, installations
·
Usines de production
·
Production, recyclage
·
Technologie
 
Downloads.
01.11.2024 | ID: P90577447
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
Pre-series Gen6 electric motor for Neue Klasse test vehicles (11/2024)
Moteurs, chaîne cinématique
·
Technologie
·
Usines, installations
·
Usines de production
 
Downloads.
03.12.2024 | ID: P90581266
Pre-series Gen6 electric motor for Neue Klasse test vehicles (11/2024)
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581196
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).
Automated Driving In-Plant (AFW), Plant Dingolfing, test track (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581195
Automated Driving In-Plant (AFW), Plant Dingolfing, test track (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581194
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581193
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581192
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581191
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581190
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581189
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Automated Driving In-Plant (AFW), Plant Dingolfing, LIDAR-Sensor (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581188
Automated Driving In-Plant (AFW), Plant Dingolfing, LIDAR-Sensor (11/2024).
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581187
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024).
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
Usines de production
·
Usines, installations
·
Production, recyclage
·
Logistics
 
Downloads.
25.11.2024 | ID: P90581186
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024).
The newly built assembly hall for electric motors at the BMW Group plant in Steyr (09/2024)
Usines, installations
·
Usines de production
 
Downloads.
03.12.2024 | ID: P90566302
The newly built assembly hall for electric motors at the BMW Group plant in Steyr (09/2024)
Helmut Hochsteiner, Head of the Electric Drive Machine division at BMW Group Plant Steyr (01/2024)
Usines de production
·
Usines, installations
·
Autres personnes au sein du BMW Group
·
Personnes
 
Downloads.
03.12.2024 | ID: P90537061
Helmut Hochsteiner, Head of the Electric Drive Machine division at BMW Group Plant Steyr (01/2024)
BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)
Usines, installations
·
Usines de production
 
Downloads.
25.11.2024 | ID: P90581175
BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)
BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)
Usines, installations
·
Usines de production
 
Downloads.
25.11.2024 | ID: P90581174
BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)
BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)
Usines, installations
·
Usines de production
 
Downloads.
25.11.2024 | ID: P90581173
BMW Group Plant Regensburg: Use of hydrogen in intralogistics by hydrogen-powered tugger trains and forklift trucks (11/2024)
BMW Group Plant Wackersdorf, battery test center (10/2024)
Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
 
Downloads.
19.11.2024 | ID: P90577258
BMW Group Plant Wackersdorf, battery test center (10/2024)
BMW Group Plant Wackersdorf, battery test center (10/2024)
Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
 
Downloads.
19.11.2024 | ID: P90577257
BMW Group Plant Wackersdorf, battery test center (10/2024)
BMW Group Plant Wackersdorf, battery test center – Dr. Felix Schmidt-Stein (project head) (10/2024)
Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
 
Downloads.
19.11.2024 | ID: P90577256
BMW Group Plant Wackersdorf, battery test center – Dr. Felix Schmidt-Stein (project head) (10/2024)
BMW Group Plant Wackersdorf, battery test center (10/2024)
Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
 
Downloads.
19.11.2024 | ID: P90577255
BMW Group Plant Wackersdorf, battery test center (10/2024)
BMW Group Plant Wackersdorf, battery test center (10/2024)
Autres personnes au sein du BMW Group
·
Personnes
·
Usines, installations
·
Usines de production
 
Downloads.
19.11.2024 | ID: P90577254
BMW Group Plant Wackersdorf, battery test center (10/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
01.11.2024 | ID: P90577444
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
01.11.2024 | ID: P90577443
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
01.11.2024 | ID: P90577442
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
01.11.2024 | ID: P90577441
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
01.11.2024 | ID: P90577440
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
01.11.2024 | ID: P90577438
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
Usines, installations
·
Usines de production
·
Série 2
·
Gran Coupé
 
Downloads.
01.11.2024 | ID: P90577437
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login