Pre-series Gen6 electric motor for Neue Klasse test vehicles (11/2024) Moteurs, chaîne cinématique·Technologie·Usines, installations·Usines de production 03.12.2024 1,85 MB
The newly built assembly hall for electric motors at the BMW Group plant in Steyr (09/2024) Usines, installations·Usines de production 03.12.2024 23,44 MB
Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024) Usines, installations·Usines de production·Production, recyclage·Technologie·Electrification·Moteurs, chaîne cinématique 03.12.2024 3,96 MB
Helmut Hochsteiner, Head of the Electric Drive Machine division at BMW Group Plant Steyr (01/2024) Usines de production·Usines, installations·Autres personnes au sein du BMW Group·Personnes 03.12.2024 3,18 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 13,86 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 11,51 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 33,12 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 15,74 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 17,21 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 16,11 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 12,35 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 10,86 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 19,36 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 14,35 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 11,61 MB
BMW R 12 S. The background of the motif was edited using AI. Série R nineT·R 12·Série R 28.11.2024 10,21 MB
The direct recycling project team at the BMW Group and its joint venture Encory (11/2024). Usines de production·Usines, installations·Développement durable·Corporate·Technologie·Production, recyclage·Electrification 27.11.2024 20,65 MB
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024). Usines, installations·Corporate·Développement durable·Technologie·Production, recyclage·Electrification·Usines de production 27.11.2024 7,62 MB
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024). Technologie·Production, recyclage·Electrification·Usines de production·Usines, installations·Développement durable·Corporate 27.11.2024 8,22 MB
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024). Développement durable·Corporate·Usines de production·Usines, installations·Technologie·Electrification·Production, recyclage 27.11.2024 9,71 MB
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024). Technologie·Production, recyclage·Electrification·Usines de production·Usines, installations·Développement durable·Corporate 27.11.2024 16,56 MB
Direct recycling at the BMW Group returns battery cell raw materials mechanically back to the loop (11/2024). Développement durable·Corporate·Technologie·Production, recyclage·Usines de production·Usines, installations·Electrification 27.11.2024 15,85 MB
Preliminary visualization of the Cell Recycling Competence Centre (CRCC) for battery cells in Kirchroth (11/2024). Usines de production·Usines, installations·Technologie·Production, recyclage·Electrification·Développement durable·Corporate 27.11.2024 18,09 MB
Automated Driving In-Plant (AFW), Plant Dingolfing (11/2024). Usines de production·Usines, installations·Production, recyclage·Logistics 25.11.2024 1,45 MB
Automated Driving In-Plant (AFW), Plant Dingolfing, test track (11/2024). Usines de production·Usines, installations·Production, recyclage·Logistics 25.11.2024 1,23 MB
Automated Driving In-Plant (AFW), Plant Leipzig (11/2024). Usines de production·Usines, installations·Production, recyclage·Logistics 25.11.2024 876 KB