Do you need help? Please contact our support team from 9 to 17 CET via
support.pressclub@bmwgroup.com.
PressClub Italia · Photo.
The 1066th pillar of the central production building of the future high-voltage battery assembly plant is placed in the prepared foundation. (10/2024)
Downloads.
20.12.2024 | ID: P90574197
The 1066th pillar of the central production building of the future high-voltage battery assembly plant is placed in the prepared foundation. (10/2024)