Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Italy · Video.

Automated Driving In-Plant (AFW)
 
Stabilimenti produttivi
·
Sedi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Mon Dec 23 10:28:43 CET 2024 | ID: PF0009838
Automated Driving In-Plant (AFW)

AEON at BMW Group Leipzig (clean)

Sedi
·
Stabilimenti produttivi
Fri Feb 27 15:19:39 CET 2026

AEON at BMW Group Leipzig (DE)

Sedi
·
Stabilimenti produttivi
Fri Feb 27 15:19:39 CET 2026

AEON at BMW Group Leipzig EN)

Sedi
·
Stabilimenti produttivi
Fri Feb 27 15:19:38 CET 2026

Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed

Stabilimenti produttivi
·
Sedi
Thu Jan 29 09:00:01 CET 2026

The Body Shop at BMW Group Plant Debrecen.

Sedi
·
Stabilimenti produttivi
Thu Oct 09 16:51:18 CEST 2025

The Body Shop at BMW Group Plant Debrecen. (Clean)

Sedi
·
Stabilimenti produttivi
Thu Oct 09 16:51:18 CEST 2025

The Assembly at BMW Group Plant Debrecen.

Sedi
·
Stabilimenti produttivi
Thu Oct 09 16:51:18 CEST 2025

The Assembly at BMW Group Plant Debrecen. (Clean)

Sedi
·
Stabilimenti produttivi
Thu Oct 09 16:51:18 CEST 2025

The Paint Shop at BMW Group Plant Debrecen.

Sedi
·
Stabilimenti produttivi
Thu Oct 09 16:51:17 CEST 2025

The Paint Shop at BMW Group Plant Debrecen. (Clean)

Sedi
·
Stabilimenti produttivi
Thu Oct 09 16:51:17 CEST 2025

Quality at BMW Group Plant Debrecen.

Sedi
·
Stabilimenti produttivi
Thu Oct 09 16:51:17 CEST 2025

Quality at BMW Group Plant Debrecen. (Clean)

Sedi
·
Stabilimenti produttivi
Thu Oct 09 16:51:17 CEST 2025
AEON at BMW Group Leipzig (clean)
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
Fri Feb 27 15:19:39 CET 2026 | ID: PF0010116
AEON at BMW Group Leipzig (clean)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
AEON at BMW Group Leipzig (DE)
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
Fri Feb 27 15:19:39 CET 2026 | ID: PF0010115
AEON at BMW Group Leipzig (DE)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
AEON at BMW Group Leipzig EN)
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
Fri Feb 27 15:19:38 CET 2026 | ID: PF0010114
AEON at BMW Group Leipzig EN)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed
 
Stabilimenti produttivi
·
Sedi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
Downloads.
Thu Jan 29 09:00:01 CET 2026 | ID: PF0010103
Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed
BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
The Body Shop at BMW Group Plant Debrecen.
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 09 16:51:18 CEST 2025 | ID: PF0010068
The Body Shop at BMW Group Plant Debrecen.
The Body Shop at BMW Group Plant Debrecen. (Clean)
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 09 16:51:18 CEST 2025 | ID: PF0010067
The Body Shop at BMW Group Plant Debrecen. (Clean)
The Assembly at BMW Group Plant Debrecen.
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 09 16:51:18 CEST 2025 | ID: PF0010066
The Assembly at BMW Group Plant Debrecen.
The Assembly at BMW Group Plant Debrecen. (Clean)
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 09 16:51:18 CEST 2025 | ID: PF0010065
The Assembly at BMW Group Plant Debrecen. (Clean)
The Paint Shop at BMW Group Plant Debrecen.
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 09 16:51:17 CEST 2025 | ID: PF0010080
The Paint Shop at BMW Group Plant Debrecen.
The Paint Shop at BMW Group Plant Debrecen. (Clean)
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 09 16:51:17 CEST 2025 | ID: PF0010079
The Paint Shop at BMW Group Plant Debrecen. (Clean)
Quality at BMW Group Plant Debrecen.
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 09 16:51:17 CEST 2025 | ID: PF0010078
Quality at BMW Group Plant Debrecen.
Quality at BMW Group Plant Debrecen. (Clean)
 
Sedi
·
Stabilimenti produttivi
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 09 16:51:17 CEST 2025 | ID: PF0010077
Quality at BMW Group Plant Debrecen. (Clean)

Search Settings.

Informação à Imprensa
Dossier de imprensa
Discurso
Fact & Figures
Photo
Fotoalben
Hochformat
Querformat
Standaufnahmen
Exterieur
Interieur
Motoren
Zeichnungen
Technologie
Produktion
On Location
Fahraufnahmen

Set publication time.

no Selection
  • no Selection
  • past 24 hours
  • past Week
  • past Month
  • past Year
Jetzt suchen
Zurücksetzen
 
So.
Mo.
Di.
Mi.
Do.
Fr.
Sa.
 
Login