Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Portugal · Photo.

BMW iX* and BMW i4 production powered by hydroelectricity from Rivers Isar and Lech. Here: LEW-hydroelectric power station in Gersthofen. Copyright: ...
i20
·
G26
·
Internal Media
·
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
·
BMW iX
·
BMW i Automobiles
·
BMW i4
·
Tecnologia
·
Produção, Reciclagem
 
Downloads.
Tue Mar 02 17:38:18 CET 2021 | ID: P90414013
BMW iX* and BMW i4 production powered by hydroelectricity from Rivers Isar and Lech. Here: LEW-hydroelectric power station in Gersthofen. Copyright: LEW/YEAH. 03/2021
BMW iX: electricity consumption combined: < 21 kWh/100km; CO2 emissions combined: 0 g/km. (provisional figures based on forecasts)

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Ambiente
·
Empresa
Mon Jul 22 09:33:38 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Tecnologia
·
Produção, Reciclagem
·
Fábricas
·
Fábricas, Instalações
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:35:45 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:35:02 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:34:20 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:32:56 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:32:12 CEST 2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
Tue Sep 17 18:53:23 CEST 2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
Tue Sep 17 18:53:23 CEST 2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy Manager of the BMW Group Plant Steyr, Tanja Hornbachner (10/2023)

Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
·
Pessoas
·
Pessoas no BMW Group
Tue Sep 17 18:53:23 CEST 2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
Tue Sep 17 18:53:23 CEST 2024

Employee of the new paint shop in Plant Debrecen with the first painted body. The installation is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas, Instalações
·
Empresa
·
Fábricas
Tue Aug 27 11:29:42 CEST 2024

The new paint shop in Plant Debrecen (08/2024).

Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Tecnologia
·
Produção, Reciclagem
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:41 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:41 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
Tue Aug 27 11:29:41 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:41 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
Tue Aug 27 11:29:41 CEST 2024

The new paint shop in Plant Debrecen (08/2024).

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
Tue Aug 27 11:29:41 CEST 2024

Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)

Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Plant Dingolfing
Wed Jul 31 06:09:45 CEST 2024

Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)

Fábricas, Instalações
·
Fábricas
·
Empresa
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
Wed Jul 31 06:09:09 CEST 2024

Markus Fallböhmer, Senior Vice President Battery Production, BMW AG, in dialogue with an employee in Dingolfing (07/2024)

Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
Wed Jul 31 06:08:37 CEST 2024

Markus Fallböhmer, Senior Vice President Battery Production, BMW AG (07/2024)

Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
Wed Jul 31 06:08:06 CEST 2024

BMW Group Plant Dingolfing 02.20 (07/2024)

Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
Wed Jul 31 06:07:33 CEST 2024

BMW Group Plant Dingolfing 02.20 (07/2024)

Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Plant Dingolfing
Wed Jul 31 06:07:02 CEST 2024

BMW Group Plant Dingolfing 02.20 (07/2024)

Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
Wed Jul 31 06:06:30 CEST 2024

Stefan Kasperowski, Vice President High-Voltage Battery production at Bavarian plants (07/2024)

Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
Wed Jul 31 06:05:56 CEST 2024

Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)

Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
Wed Jul 31 06:05:24 CEST 2024

Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)

Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Plant Dingolfing
Wed Jul 31 06:04:50 CEST 2024

Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)

Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
Wed Jul 31 06:04:19 CEST 2024

Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)

Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Motores, Transmissão
Wed Jul 31 06:03:50 CEST 2024

Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)

Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
Wed Jul 31 06:03:19 CEST 2024

Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)

Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Plant Dingolfing
Wed Jul 31 06:02:47 CEST 2024

Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)

Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
Wed Jul 31 06:02:15 CEST 2024
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Ambiente
·
Empresa
 
Downloads.
Mon Jul 22 09:33:38 CEST 2024 | ID: P90554298
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Tecnologia
·
Produção, Reciclagem
·
Fábricas
·
Fábricas, Instalações
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:35:45 CEST 2024 | ID: P90554293
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:35:02 CEST 2024 | ID: P90554294
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:34:20 CEST 2024 | ID: P90554295
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:32:56 CEST 2024 | ID: P90554297
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:32:12 CEST 2024 | ID: P90554296
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90527373
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90527372
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy ...
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
·
Pessoas
·
Pessoas no BMW Group
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90527371
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy Manager of the BMW Group Plant Steyr, Tanja Hornbachner (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90527370
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Employee of the new paint shop in Plant Debrecen with the first painted body. The installation is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563721
Employee of the new paint shop in Plant Debrecen with the first painted body. The installation is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563720
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563714
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas, Instalações
·
Empresa
·
Fábricas
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563713
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The new paint shop in Plant Debrecen (08/2024).
Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563712
The new paint shop in Plant Debrecen (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Tecnologia
·
Produção, Reciclagem
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563711
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563710
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563709
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563708
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563719
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563717
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563716
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563715
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563707
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The new paint shop in Plant Debrecen (08/2024).
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563706
The new paint shop in Plant Debrecen (08/2024).
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:09:45 CEST 2024 | ID: P90559467
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)
Fábricas, Instalações
·
Fábricas
·
Empresa
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
 
Downloads.
Wed Jul 31 06:09:09 CEST 2024 | ID: P90559461
Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)
Markus Fallböhmer, Senior Vice President Battery Production, BMW AG, in dialogue with an employee in Dingolfing (07/2024)
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Wed Jul 31 06:08:37 CEST 2024 | ID: P90559462
Markus Fallböhmer, Senior Vice President Battery Production, BMW AG, in dialogue with an employee in Dingolfing (07/2024)
Markus Fallböhmer, Senior Vice President Battery Production, BMW AG (07/2024)
Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
 
Downloads.
Wed Jul 31 06:08:06 CEST 2024 | ID: P90559463
Markus Fallböhmer, Senior Vice President Battery Production, BMW AG (07/2024)
BMW Group Plant Dingolfing 02.20 (07/2024)
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:07:33 CEST 2024 | ID: P90559475
BMW Group Plant Dingolfing 02.20 (07/2024)
BMW Group Plant Dingolfing 02.20 (07/2024)
Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:07:02 CEST 2024 | ID: P90559476
BMW Group Plant Dingolfing 02.20 (07/2024)
BMW Group Plant Dingolfing 02.20 (07/2024)
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:06:30 CEST 2024 | ID: P90559477
BMW Group Plant Dingolfing 02.20 (07/2024)
Stefan Kasperowski, Vice President High-Voltage Battery production at Bavarian plants (07/2024)
Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
 
Downloads.
Wed Jul 31 06:05:56 CEST 2024 | ID: P90559460
Stefan Kasperowski, Vice President High-Voltage Battery production at Bavarian plants (07/2024)
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Wed Jul 31 06:05:24 CEST 2024 | ID: P90559468
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:04:50 CEST 2024 | ID: P90559469
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:04:19 CEST 2024 | ID: P90559470
Production of high-voltage batteries at BMW Group Plant Dingolfing 02.20 (07/2024)
Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)
Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Motores, Transmissão
 
Downloads.
Wed Jul 31 06:03:50 CEST 2024 | ID: P90559474
Klaus von Moltke, Senior Vice President Engine Produciton, BMW AG (07/2024)
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:03:19 CEST 2024 | ID: P90559464
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Fábricas, Instalações
·
Fábricas
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:02:47 CEST 2024 | ID: P90559465
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:02:15 CEST 2024 | ID: P90559466
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)

Change Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login