Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Portugal · Photo.

Bavarian Minister of Economic Affairs Hubert Aiwanger and BMW Group Board of Management Member Dr Andreas Wendt learned about development of ...
Eventos Institucionais
·
Empresa
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Thu May 06 15:00:52 CEST 2021 | ID: P90420058
Bavarian Minister of Economic Affairs Hubert Aiwanger and BMW Group Board of Management Member Dr Andreas Wendt learned about development of alternative CO2-free drive technologies at the “Hydrogen Technology Day” held today at the Lightweight Construction and Technology Centre (LuTZ) at BMW Group Plant Landshut in Lower Bavaria. (05/2021)

BMW Group Plant Steyr at the Austrian World Summit 2024 (06/2024)

Empresa
·
Eventos Institucionais
·
Fábricas, Instalações
·
Fábricas
Tue Sep 17 18:53:23 CEST 2024

Slurry Analysis in the Laboratory (10/2023).

Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
Fri Sep 13 10:50:52 CEST 2024

Cell Assembly: Round Cells on their Way to Formation (10/2023).

Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
Fri Sep 13 10:50:52 CEST 2024

Mechanical Parts of the Round Cells (10/2023).

Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
Fri Sep 13 10:50:52 CEST 2024

Winding of the Jelly Rolls: Process Monitoring (10/2023).

Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
Fri Sep 13 10:50:52 CEST 2024

Winding of the Jelly Rolls: Employees with Anode Coil (10/2023).

Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
Fri Sep 13 10:50:52 CEST 2024

Winding of the Jelly Rolls: Set Up (10/2023).

Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
Fri Sep 13 10:50:52 CEST 2024

Dosing and Mixing: Sample taking of the Slurry for Analysis (10/2023).

Empresa
·
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Electrification
Fri Sep 13 10:50:52 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas, Instalações
·
Empresa
·
Fábricas
Tue Aug 27 11:29:42 CEST 2024

Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)

Fábricas, Instalações
·
Fábricas
·
Empresa
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
Wed Jul 31 06:09:09 CEST 2024

Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)

Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
Wed Jul 31 06:02:15 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Tecnologia
·
Produção, Reciclagem
·
Fábricas
·
Fábricas, Instalações
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:35:45 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:35:02 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:34:20 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Ambiente
·
Empresa
Mon Jul 22 09:33:38 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:32:56 CEST 2024

BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Empresa
Mon Jul 22 09:32:12 CEST 2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
Tue Sep 17 18:53:23 CEST 2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
Tue Sep 17 18:53:23 CEST 2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy Manager of the BMW Group Plant Steyr, Tanja Hornbachner (10/2023)

Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
·
Pessoas
·
Pessoas no BMW Group
Tue Sep 17 18:53:23 CEST 2024

In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)

Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
Tue Sep 17 18:53:23 CEST 2024

The winners of the BMW Group Award for Social Responsibility 2024: Björn Sommer, Graham Darab, Sibusiso Thusi, Karin Kollross (from left) with Ilka Horstmeier, Member of the Board of Management BMW AG, People and Real Estate, Labour Relations Director, and Patron of the Award (middle) (09/2024)

Eventos Institucionais
·
Empresa
·
Sustentabilidade
·
Sociedade
Tue Sep 17 18:52:56 CEST 2024

Last BMW X3 G01 from Rosslyn (08/2024)

G48
·
X3
·
Eventos Institucionais
·
Empresa
Thu Sep 05 10:20:10 CEST 2024

Farewell to last BMW X3 G01 (08/2024)

Eventos Institucionais
·
Empresa
·
X3
Thu Sep 05 10:20:10 CEST 2024

Employee of the new paint shop in Plant Debrecen with the first painted body. The installation is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
Tue Aug 27 11:29:42 CEST 2024

The new paint shop in Plant Debrecen (08/2024).

Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Tecnologia
·
Produção, Reciclagem
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
Tue Aug 27 11:29:42 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:41 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:41 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
Tue Aug 27 11:29:41 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
Tue Aug 27 11:29:41 CEST 2024

The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).

Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
Tue Aug 27 11:29:41 CEST 2024

The new paint shop in Plant Debrecen (08/2024).

Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
Tue Aug 27 11:29:41 CEST 2024

Plastic parts production at BMW Group Plant Leipzig (08/2024)

Fábricas
·
Fábricas, Instalações
Mon Aug 19 18:42:28 CEST 2024

Plastic parts production at BMW Group Plant Leipzig (08/2024)

Fábricas
·
Fábricas, Instalações
Mon Aug 19 18:42:28 CEST 2024
BMW Group Plant Steyr at the Austrian World Summit 2024 (06/2024)
Empresa
·
Eventos Institucionais
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90557144
BMW Group Plant Steyr at the Austrian World Summit 2024 (06/2024)
Slurry Analysis in the Laboratory (10/2023).
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
 
Downloads.
Fri Sep 13 10:50:52 CEST 2024 | ID: P90528889
Slurry Analysis in the Laboratory (10/2023).
Cell Assembly: Round Cells on their Way to Formation (10/2023).
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
 
Downloads.
Fri Sep 13 10:50:52 CEST 2024 | ID: P90528887
Cell Assembly: Round Cells on their Way to Formation (10/2023).
Mechanical Parts of the Round Cells (10/2023).
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
 
Downloads.
Fri Sep 13 10:50:52 CEST 2024 | ID: P90528886
Mechanical Parts of the Round Cells (10/2023).
Winding of the Jelly Rolls: Process Monitoring (10/2023).
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
 
Downloads.
Fri Sep 13 10:50:52 CEST 2024 | ID: P90528885
Winding of the Jelly Rolls: Process Monitoring (10/2023).
Winding of the Jelly Rolls: Employees with Anode Coil (10/2023).
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
 
Downloads.
Fri Sep 13 10:50:52 CEST 2024 | ID: P90528884
Winding of the Jelly Rolls: Employees with Anode Coil (10/2023).
Winding of the Jelly Rolls: Set Up (10/2023).
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Electrification
·
Tecnologia
 
Downloads.
Fri Sep 13 10:50:52 CEST 2024 | ID: P90528882
Winding of the Jelly Rolls: Set Up (10/2023).
Dosing and Mixing: Sample taking of the Slurry for Analysis (10/2023).
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Electrification
 
Downloads.
Fri Sep 13 10:50:52 CEST 2024 | ID: P90528874
Dosing and Mixing: Sample taking of the Slurry for Analysis (10/2023).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas, Instalações
·
Empresa
·
Fábricas
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563713
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)
Fábricas, Instalações
·
Fábricas
·
Empresa
·
Produção, Reciclagem
·
Tecnologia
·
Electrification
 
Downloads.
Wed Jul 31 06:09:09 CEST 2024 | ID: P90559461
Markus Fallböhmer, now Senior Vice President Battery Production, BMW AG, at the production line commissioning for e-drive components in 2014 (07/2024)
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
Produção, Reciclagem
·
Tecnologia
·
Electrification
·
Empresa
·
Fábricas, Instalações
·
Fábricas
·
Plant Dingolfing
 
Downloads.
Wed Jul 31 06:02:15 CEST 2024 | ID: P90559466
Production of electric engines at BMW Group Plant Dingolfing 02.20 (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Tecnologia
·
Produção, Reciclagem
·
Fábricas
·
Fábricas, Instalações
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:35:45 CEST 2024 | ID: P90554293
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:35:02 CEST 2024 | ID: P90554294
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:34:20 CEST 2024 | ID: P90554295
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Ambiente
·
Empresa
 
Downloads.
Mon Jul 22 09:33:38 CEST 2024 | ID: P90554298
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:32:56 CEST 2024 | ID: P90554297
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
·
Sustentabilidade
·
Empresa
 
Downloads.
Mon Jul 22 09:32:12 CEST 2024 | ID: P90554296
BMW Group introduces electrically powered exhaust purification in first paint shops (07/2024)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90527373
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90527372
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy ...
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
·
Pessoas
·
Pessoas no BMW Group
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90527371
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. In the picture: Energy Manager of the BMW Group Plant Steyr, Tanja Hornbachner (10/2023)
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
Ambiente
·
Sustentabilidade
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Sep 17 18:53:23 CEST 2024 | ID: P90527370
In the future, the BMW Group plant in Steyr will rely even more on district heating from regional biomass from dead wood. (10/2023)
The winners of the BMW Group Award for Social Responsibility 2024: Björn Sommer, Graham Darab, Sibusiso Thusi, Karin Kollross (from left) with Ilka ...
Eventos Institucionais
·
Empresa
·
Sustentabilidade
·
Sociedade
 
Downloads.
Tue Sep 17 18:52:56 CEST 2024 | ID: P90568799
The winners of the BMW Group Award for Social Responsibility 2024: Björn Sommer, Graham Darab, Sibusiso Thusi, Karin Kollross (from left) with Ilka Horstmeier, Member of the Board of Management BMW AG, People and Real Estate, Labour Relations Director, and Patron of the Award (middle) (09/2024)
Last BMW X3 G01 from Rosslyn (08/2024)
G48
·
X3
·
Eventos Institucionais
·
Empresa
 
Downloads.
Thu Sep 05 10:20:10 CEST 2024 | ID: P90565784
Last BMW X3 G01 from Rosslyn (08/2024)
Farewell to last BMW X3 G01 (08/2024)
Eventos Institucionais
·
Empresa
·
X3
 
Downloads.
Thu Sep 05 10:20:10 CEST 2024 | ID: P90565783
Farewell to last BMW X3 G01 (08/2024)
Employee of the new paint shop in Plant Debrecen with the first painted body. The installation is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563721
Employee of the new paint shop in Plant Debrecen with the first painted body. The installation is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563720
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563714
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The new paint shop in Plant Debrecen (08/2024).
Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563712
The new paint shop in Plant Debrecen (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Tecnologia
·
Produção, Reciclagem
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563711
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563710
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563709
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
 
Downloads.
Tue Aug 27 11:29:42 CEST 2024 | ID: P90563708
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563719
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563717
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Fábricas
·
Fábricas, Instalações
·
Produção, Reciclagem
·
Tecnologia
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563716
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Produção, Reciclagem
·
Tecnologia
·
Fábricas
·
Fábricas, Instalações
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563715
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
Tecnologia
·
Produção, Reciclagem
·
Fábricas, Instalações
·
Fábricas
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563707
The installation of the new paint shop in Plant Debrecen is enabled using BMW iX1 bodies (08/2024).
The new paint shop in Plant Debrecen (08/2024).
Fábricas, Instalações
·
Fábricas
·
Tecnologia
·
Produção, Reciclagem
 
Downloads.
Tue Aug 27 11:29:41 CEST 2024 | ID: P90563706
The new paint shop in Plant Debrecen (08/2024).
Plastic parts production at BMW Group Plant Leipzig (08/2024)
Fábricas
·
Fábricas, Instalações
 
Downloads.
Mon Aug 19 18:42:28 CEST 2024 | ID: P90564828
Plastic parts production at BMW Group Plant Leipzig (08/2024)
Plastic parts production at BMW Group Plant Leipzig (08/2024)
Fábricas
·
Fábricas, Instalações
 
Downloads.
Mon Aug 19 18:42:28 CEST 2024 | ID: P90564827
Plastic parts production at BMW Group Plant Leipzig (08/2024)

Change Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login