Sie benötigen Hilfe? Bitte kontaktieren Sie unser Support Team von 9.00 - 17.00 via
support.pressclub@bmwgroup.com.
PressClub España · Photo.
The initial moment for the start of e-engine series production at the BMW Group Plant Steyr (from left): Klaus von Moltke, SVP of Engine Production at ...
Downloads.
Thu Aug 07 10:00:01 CEST 2025 | ID: P90613244
The initial moment for the start of e-engine series production at the BMW Group Plant Steyr (from left): Klaus von Moltke, SVP of Engine Production at BMW AG, with the Austrian Chancellor Christian Stocker and Milan Nedeljković, Member of the Board of Management for Production at BMW AG. (08/2025)