Do you need help? Please contact our support team from 9 to 17 CET via
support.pressclub@bmwgroup.com.
PressClub Greece · Photo.
Parallel to the position of the last pillar, the roof at the other end of the 300 by 500 meter long assembly hall is already being closed, windows are ...
Downloads.
Thu Oct 24 08:00:01 CEST 2024 | ID: P90574201
Parallel to the position of the last pillar, the roof at the other end of the 300 by 500 meter long assembly hall is already being closed, windows are being installed and the first technical building equipment is being installed. (10/2024)