Zum Inhalt springen



 
 
Production Plants
 
Enter search term
 
Search Search options
Reset
to

Production Plants


Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, telescopic fork (04/2015). Detail
 
07.05.2015 | P90180454
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, telescopic fork (04/2015).
07.05.2015 | P90180454
Start of Production of the new S 1000 XR at the BMW Plant Berlin – Project Team BMW Plant Berlin (04/2105). Detail
 
07.05.2015 | P90180501
Start of Production of the new S 1000 XR at the BMW Plant Berlin – Project Team BMW Plant Berlin (04/2105).
07.05.2015 | P90180501
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, water cooler (04/2015). Detail
 
07.05.2015 | P90180500
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, water cooler (04/2015).
07.05.2015 | P90180500
Start of Production of the new S 1000 XR at the BMW Plant Berlin – Finish (04/2015). Detail
 
07.05.2015 | P90180499
Start of Production of the new S 1000 XR at the BMW Plant Berlin – Finish (04/2015).
07.05.2015 | P90180499
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Finish, Assembly tank cover (04/2015). Detail
 
07.05.2015 | P90180448
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Finish, Assembly tank cover (04/2015).
07.05.2015 | P90180448
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, Control station  (04/2015). Detail
 
07.05.2015 | P90180450
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, Control station (04/2015).
07.05.2015 | P90180450
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, telescopic fork  (04/2015). Detail
 
07.05.2015 | P90180453
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, telescopic fork (04/2015).
07.05.2015 | P90180453
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, rear wheel (04/2015). Detail
 
07.05.2015 | P90180452
Start of Production of the new S 1000 XR at the BMW Plant Berlin - Assembly line, rear wheel (04/2015).
07.05.2015 | P90180452
Start of Production of the new S 1000 XR at the BMW Plant Berlin - - Assembly line, Bowden cable for flue gas damper (04/2015). Detail
 
07.05.2015 | P90180451
Start of Production of the new S 1000 XR at the BMW Plant Berlin - - Assembly line, Bowden cable for flue gas damper (04/2015).
07.05.2015 | P90180451
Start of Production of the new S 1000 XR at the BMW Plant Berlin - - Finish, Assembly side panel (04/2015). Detail
 
07.05.2015 | P90180449
Start of Production of the new S 1000 XR at the BMW Plant Berlin - - Finish, Assembly side panel (04/2015).
07.05.2015 | P90180449
(Pictured Left to Right), BMW Manufacturing Associates: Thomas Watson (#752), Pamela Shaw (#1668),  Dawn Burgess (#433),  Shirley Scott (#1309) and President and CEO, Manfred Erlacher. (03/2015) Detail
 
25.03.2015 | P90177935
(Pictured Left to Right), BMW Manufacturing Associates: Thomas Watson (#752), Pamela Shaw (#1668), Dawn Burgess (#433), Shirley Scott (#1309) and President and CEO, Manfred Erlacher. (03/2015)
25.03.2015 | P90177935
The new 5-door is about to enter the robot spray booth in Plant Oxford's paintshop. Detail
 
09.09.2014 | P90153145
The new 5-door is about to enter the robot spray booth in Plant Oxford's paintshop.
09.09.2014 | P90153145
Robots welding the side frame for the new 5-door MINI in Plant Oxford's bodyshop. Detail
 
09.09.2014 | P90153137
Robots welding the side frame for the new 5-door MINI in Plant Oxford's bodyshop.
09.09.2014 | P90153137
An associate working on the new 5-door MINI in Plant Oxford's assembly hall. Detail
 
09.09.2014 | P90153135
An associate working on the new 5-door MINI in Plant Oxford's assembly hall.
09.09.2014 | P90153135
5-door hatch in the rotary sling in Plant Oxford's assembly hall. Detail
 
09.09.2014 | P90153107
5-door hatch in the rotary sling in Plant Oxford's assembly hall.
09.09.2014 | P90153107
Driving off the finishing line. Detail
 
09.09.2014 | P90139494
Driving off the finishing line.
09.09.2014 | P90139494
The final part of the production process in assembly. Detail
 
09.09.2014 | P90139493
The final part of the production process in assembly.
09.09.2014 | P90139493
At engine marriage as the engine is lifted up under the car for fitment. Detail
 
09.09.2014 | P90139490
At engine marriage as the engine is lifted up under the car for fitment.
09.09.2014 | P90139490
Final inspection on the seam seal line. Detail
 
09.09.2014 | P90139480
Final inspection on the seam seal line.
09.09.2014 | P90139480
The MINI's new paint being baked in the oven at Plant Oxford's paintshop. Detail
 
09.09.2014 | P90139475
The MINI's new paint being baked in the oven at Plant Oxford's paintshop.
09.09.2014 | P90139475
The final outer bonnet skins leaving the end of line 15, in the press shop, MINI Plant Swindon. Detail
 
09.09.2014 | P90139470
The final outer bonnet skins leaving the end of line 15, in the press shop, MINI Plant Swindon.
09.09.2014 | P90139470
Inline measurement of car body. Detail
 
09.09.2014 | P90139169
Inline measurement of car body.
09.09.2014 | P90139169
Car waiting for body sides to be spot welded. Detail
 
09.09.2014 | P90139168
Car waiting for body sides to be spot welded.
09.09.2014 | P90139168
An Electric Blue MINI 5-door comes off the assembly line. Detail
 
09.09.2014 | P90153750
An Electric Blue MINI 5-door comes off the assembly line.
09.09.2014 | P90153750
In the robot spray booth in Plant Oxford's paintshop. Detail
 
09.09.2014 | P90153147
In the robot spray booth in Plant Oxford's paintshop.
09.09.2014 | P90153147
The bodyshell of the new 5-door MINI as it goes through Plant Oxford's bodyshop. Detail
 
09.09.2014 | P90153140
The bodyshell of the new 5-door MINI as it goes through Plant Oxford's bodyshop.
09.09.2014 | P90153140
Working on the tailgate in Plant Oxford's assembly hall. Detail
 
09.09.2014 | P90153136
Working on the tailgate in Plant Oxford's assembly hall.
09.09.2014 | P90153136
Associates working on the MINI 5-door at the first production line in Plant Oxford's assembly hall. Detail
 
09.09.2014 | P90153133
Associates working on the MINI 5-door at the first production line in Plant Oxford's assembly hall.
09.09.2014 | P90153133
The car in the rotary slings at Plant Oxford. Detail
 
09.09.2014 | P90139485
The car in the rotary slings at Plant Oxford.
09.09.2014 | P90139485
Lining up to be given a final polish. Detail
 
09.09.2014 | P90139483
Lining up to be given a final polish.
09.09.2014 | P90139483
Polish and check to remove surface dust. Detail
 
09.09.2014 | P90139481
Polish and check to remove surface dust.
09.09.2014 | P90139481
Inside line 15, bonnets being pressed, in the press shop, MINI Plant Swindon. Detail
 
09.09.2014 | P90139469
Inside line 15, bonnets being pressed, in the press shop, MINI Plant Swindon.
09.09.2014 | P90139469
A MINI is tested in the new acoustic testing chamber. Detail
 
09.09.2014 | P90139463
A MINI is tested in the new acoustic testing chamber.
09.09.2014 | P90139463
A MINI is tested in the new acoustic testing chamber. Detail
 
09.09.2014 | P90139462
A MINI is tested in the new acoustic testing chamber.
09.09.2014 | P90139462
Simultaneous spot welding of a sub assembly in a geometry fixture. Detail
 
09.09.2014 | P90139450
Simultaneous spot welding of a sub assembly in a geometry fixture.
09.09.2014 | P90139450
Body side sub assembly with portal robot. Detail
 
09.09.2014 | P90139166
Body side sub assembly with portal robot.
09.09.2014 | P90139166
Body side transfer robot. Detail
 
09.09.2014 | P90139165
Body side transfer robot.
09.09.2014 | P90139165
Celebrating the three millionth MINI at Plant Oxford on 9th September 2014. L-r:: Board of Management member for Production Harald Krüger;  Frank Bachmann, managing director of MINI Plants Oxford and Swindon; Baroness Kramer, Minister for Transport and Board of Management member Peter Schwarzenbauer, MINI, BMW Motorrad, Rolls-Royce and Aftersales. Detail
 
09.09.2014 | P90162393
Celebrating the three millionth MINI at Plant Oxford on 9th September 2014. L-r:: Board of Management member for Production Harald Krüger; Frank Bachmann, managing director of MINI Plants Oxford and Swindon; Baroness Kramer, Minister for Transport and Board of Management member Peter Schwarzenbauer, MINI, BMW Motorrad, Rolls-Royce and Aftersales.
09.09.2014 | P90162393
The three millionth MINI is driven off the production line at Plant Oxford (9 September 2014). Detail
 
09.09.2014 | P90162392
The three millionth MINI is driven off the production line at Plant Oxford (9 September 2014).
09.09.2014 | P90162392
In the robot spray booth in Plant Oxford's paintshop. Detail
 
09.09.2014 | P90153146
In the robot spray booth in Plant Oxford's paintshop.
09.09.2014 | P90153146

Newsletter Settings

You are currently not logged in. Please log in to edit your news service.