Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Česká republika · Video.

BMW i5 Production Plant Dingolfing
 
i5
·
BMW i
·
Lokace
·
Výrobní závody
·
Výroba a recyklace
·
Technologie
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Production - Front views with details, Engine with details, Side views with details, Rear views with details, Cockpit with details, Seats front and back with details
Downloads.
Fri Jul 21 10:43:46 CEST 2023 | ID: PF0009484
BMW i5 Production Plant Dingolfing
Production - Front views with details, Engine with details, Side views with details, Rear views with details, Cockpit with details, Seats front and back with details

Start of production BMW i3 at BMW Plant Munich

I01
·
BMW i
·
i3
·
Výrobní závody
·
Lokace
·
Řada 3
·
Recyklace
·
Výroba a recyklace
·
Výroba
Fri Aug 07 09:15:12 CEST 2026

Round Cell Production in the BMW Group Cell Manufacturing Competence Center

Technologie
·
Výroba a recyklace
·
Lokace
·
Výrobní závody
Thu Oct 26 11:49:02 CEST 2023

Production of battery modules at BMW Group Plant Leipzig

Electrification
·
Technologie
·
Lokace
·
Výrobní závody
Thu Oct 20 11:55:40 CEST 2022

From material selection to prototype construction: The battery cell technology of the future is taking shape at the BMW Group Battery Cell Competence Centre.

Výrobní závody
·
Lokace
·
Technologie
·
Electrification
Tue Dec 17 22:08:49 CET 2019

High-Voltage Battery Assembly at BMW Group Plant Woodruff

Lokace
·
Výrobní závody
Mon Jul 27 15:00:00 CEST 2026

High-Voltage Battery Assembly at BMW Group Plant Woodruff

Lokace
·
Výrobní závody
Mon Jul 27 15:00:00 CEST 2026

AEON at BMW Group Leipzig (clean)

Lokace
·
Výrobní závody
Fri Feb 27 15:51:59 CET 2026

AEON at BMW Group Leipzig (DE)

Lokace
·
Výrobní závody
Fri Feb 27 15:51:59 CET 2026

AEON at BMW Group Leipzig EN)

Lokace
·
Výrobní závody
Fri Feb 27 15:51:58 CET 2026

e-mobility in the BMW Group's production network

Výrobní závody
·
Lokace
Tue May 27 11:30:35 CEST 2025

Automated Driving In-Plant (AFW)

Výrobní závody
·
Lokace
Tue Nov 26 08:00:00 CET 2024

BMW Group Software Development.

G70
·
U11
·
i7
·
iX1
·
BMW i
·
Technologie
Thu Jul 18 07:54:08 CEST 2024
Start of production BMW i3 at BMW Plant Munich
 
I01
·
BMW i
·
i3
·
Výrobní závody
·
Lokace
·
Řada 3
·
Recyklace
·
Výroba a recyklace
·
Výroba
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Images of series production BMW i3 at BMW Plant Munich
Provisional data for BMW i3 50 xDrive: WLTP combined (EnVKV): energy consumption 16.1-13.4 kWh/100 km; CO₂ emissions 0 g/km; CO₂ class A; range 758-912 km) Actual figures depend on various factors, e.g. charging power, driving style, route, weather conditions, auxiliary electrical consumption (including air conditioning), tyres and battery state of health. BMW iX3 50 xDrive: energy consumption combined: 18.1-15.1 kWh/100 km (WLTP); CO₂ emissions combined: 0 g/km (WLTP); CO₂ class(es): A; electric range: 673-805 km (WLTP)
Downloads.
Fri Aug 07 09:15:12 CEST 2026 | ID: PF0010233
Start of production BMW i3 at BMW Plant Munich
Images of series production BMW i3 at BMW Plant Munich
Provisional data for BMW i3 50 xDrive: WLTP combined (EnVKV): energy consumption 16.1-13.4 kWh/100 km; CO₂ emissions 0 g/km; CO₂ class A; range 758-912 km) Actual figures depend on various factors, e.g. charging power, driving style, route, weather conditions, auxiliary electrical consumption (including air conditioning), tyres and battery state of health. BMW iX3 50 xDrive: energy consumption combined: 18.1-15.1 kWh/100 km (WLTP); CO₂ emissions combined: 0 g/km (WLTP); CO₂ class(es): A; electric range: 673-805 km (WLTP)
Round Cell Production in the BMW Group Cell Manufacturing Competence Center
 
Technologie
·
Výroba a recyklace
·
Lokace
·
Výrobní závody
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Explanatory video of the round cell production (pilot line) in the CMCC in Parsdorf
Downloads.
Thu Oct 26 11:49:02 CEST 2023 | ID: PF0009592
Round Cell Production in the BMW Group Cell Manufacturing Competence Center
Explanatory video of the round cell production (pilot line) in the CMCC in Parsdorf
Production of battery modules at BMW Group Plant Leipzig
 
Electrification
·
Technologie
·
Lokace
·
Výrobní závody
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Thu Oct 20 11:55:40 CEST 2022 | ID: PF0008877
Production of battery modules at BMW Group Plant Leipzig
From material selection to prototype construction: The battery cell technology of the future is taking shape at the BMW Group Battery Cell Competence ...
 
Výrobní závody
·
Lokace
·
Technologie
·
Electrification
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Dec 17 22:08:49 CET 2019 | ID: PF0007237
From material selection to prototype construction: The battery cell technology of the future is taking shape at the BMW Group Battery Cell Competence Centre.
High-Voltage Battery Assembly at BMW Group Plant Woodruff
 
Lokace
·
Výrobní závody
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Mon Jul 27 15:00:00 CEST 2026 | ID: PF0010221
High-Voltage Battery Assembly at BMW Group Plant Woodruff
High-Voltage Battery Assembly at BMW Group Plant Woodruff
 
Lokace
·
Výrobní závody
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Mon Jul 27 15:00:00 CEST 2026 | ID: PF0010220
High-Voltage Battery Assembly at BMW Group Plant Woodruff
AEON at BMW Group Leipzig (clean)
 
Lokace
·
Výrobní závody
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
Fri Feb 27 15:51:59 CET 2026 | ID: PF0010116
AEON at BMW Group Leipzig (clean)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
AEON at BMW Group Leipzig (DE)
 
Lokace
·
Výrobní závody
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
Fri Feb 27 15:51:59 CET 2026 | ID: PF0010115
AEON at BMW Group Leipzig (DE)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
AEON at BMW Group Leipzig EN)
 
Lokace
·
Výrobní závody
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
Downloads.
Fri Feb 27 15:51:58 CET 2026 | ID: PF0010114
AEON at BMW Group Leipzig EN)
BMW AEON Robot at Plant Leipzig, Operation areas Battery Assembly and Componet Manufacturing.
e-mobility in the BMW Group's production network
 
Výrobní závody
·
Lokace
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


The film showcases the rapid transformation of the automotive industry and poses the question: How fast will the transition to electromobility progress? It first highlights the increasing demand for electric vehicles, accompanied by dynamic production imagery. The growing BEV share in the production network is illustrated through key milestones. The film emphasises production flexibility, demonstrating BMW’s ability to adapt quickly to market developments with its ICE, hybrid, and BEV plants. The global expansion of electromobility is highlighted by the establishment of new fully electric production sites in Debrecen (2025) and Munich (2027). The film concludes with BMW Group’s vision: "We don't predict the future – we build it." The future of electromobility is not just anticipated – it is actively shaped.
Downloads.
Tue May 27 11:30:35 CEST 2025 | ID: PF0009958
e-mobility in the BMW Group's production network
The film showcases the rapid transformation of the automotive industry and poses the question: How fast will the transition to electromobility progress? It first highlights the increasing demand for electric vehicles, accompanied by dynamic production imagery. The growing BEV share in the production network is illustrated through key milestones. The film emphasises production flexibility, demonstrating BMW’s ability to adapt quickly to market developments with its ICE, hybrid, and BEV plants. The global expansion of electromobility is highlighted by the establishment of new fully electric production sites in Debrecen (2025) and Munich (2027). The film concludes with BMW Group’s vision: "We don't predict the future – we build it." The future of electromobility is not just anticipated – it is actively shaped.
Automated Driving In-Plant (AFW)
 
Výrobní závody
·
Lokace
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Nov 26 08:00:00 CET 2024 | ID: PF0009838
Automated Driving In-Plant (AFW)
BMW Group Software Development.
 
G70
·
U11
·
i7
·
iX1
·
BMW i
·
Technologie
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Software has been at the core of BMW Group vehicle development for years.
BMW i7 xDrive60 Combined consumption in accordance with WLTP: 19.6 — 18.4 kWh/100 km, combined consumption in accordance with NEDC: —, range: 591 — 625 km in accordance with WLTP. BMW iX1 xDrive30: combined energy consumption: 16.9 kWh/100 km (WLTP); combined CO2 emissions: 0 g/km (WLTP); CO2 class: A; electric range: 439 km (WLTP); output: 230 kW (313 hp)
Downloads.
Thu Jul 18 07:54:08 CEST 2024 | ID: PF0009743
BMW Group Software Development.
Software has been at the core of BMW Group vehicle development for years.
BMW i7 xDrive60 Combined consumption in accordance with WLTP: 19.6 — 18.4 kWh/100 km, combined consumption in accordance with NEDC: —, range: 591 — 625 km in accordance with WLTP. BMW iX1 xDrive30: combined energy consumption: 16.9 kWh/100 km (WLTP); combined CO2 emissions: 0 g/km (WLTP); CO2 class: A; electric range: 439 km (WLTP); output: 230 kW (313 hp)

Search Settings.

HighRes MOV
LowRes MPEG-4
LowRes MOV
LowRes FLV

Set publication time.

no Selection
  • no Selection
  • past 24 hours
  • past Week
  • past Month
  • past Year
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Přihlásit