Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Magyarország · Photo.

Aerial Shot BMW Group Plant Dingolfing, Production site 02.40. (10/2023)
Vállalati örökség
·
Örökség
 
Downloads.
18.10.2023 | ID: P90527551
Aerial Shot BMW Group Plant Dingolfing, Production site 02.40. (10/2023)

BMW festive campaign “Das Geschenk”

BMW örökség
·
Örökség
20.12.2024

BMW festive campaign “Das Geschenk”

BMW örökség
·
Örökség
20.12.2024

BMW festive campaign “Das Geschenk”

BMW örökség
·
Örökség
20.12.2024

BMW festive campaign “Das Geschenk”

BMW örökség
·
Örökség
20.12.2024

BMW festive campaign “Das Geschenk”

BMW örökség
·
Örökség
20.12.2024

BMW festive campaign “Das Geschenk”

BMW örökség
·
Örökség
20.12.2024

BMW festive campaign “Das Geschenk”

BMW örökség
·
Örökség
20.12.2024

BMW festive campaign “Das Geschenk”

BMW örökség
·
Örökség
20.12.2024

Grand Hotel Villa d'Este

Örökség
·
Veterános események
11.12.2024

Grand Hotel Villa d'Este

Örökség
·
Veterános események
11.12.2024

Concorso d'Eleganza Villa d'Este Key Visual 2025

Örökség
·
Veterános események
11.12.2024

Concorso d'Eleganza Villa d'Este Key Visual 2025

Örökség
·
Veterános események
11.12.2024

Concorso d'Eleganza Villa d'Este Key Visiual 2025

Örökség
·
Veterános események
11.12.2024

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Metal Fraction after Recycling Process. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Dismantling and Discharging Modules. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Voltage Testing Modules. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Discharging Modules. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Discharging Modules. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Dismantling High Voltage Battery. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Dismantling High Voltage Battery. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)

Gyártás és újrahasznosítás
·
Technológia
·
Electrification
·
Üzemek, létesítmények
·
Gyártóüzemek
13.01.2025

BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)

Üzemek, létesítmények
·
Gyártóüzemek
·
Gyártás és újrahasznosítás
·
Technológia
·
Electrification
13.01.2025

From the cell to the high-voltage battery of the fifth generation. The production system for the high-voltage battery can be divided into three autonomous, sequential process steps: cell painting, module production and battery assembly. (01/2023)

Electrification
·
Technológia
13.01.2025

The fifth-generation of BMW Group's electric drive. Its main components are the electric drive unit and the high-voltage battery. The electric drive unit consists of the electric engine, the transmission and the power electronics. It does not contain any rare earths. The high-voltage battery consists of several battery modules, which are interconnected and integrated into the housing. (01/2023)

Electrification
·
Technológia
13.01.2025

Preparation Recycling Process. Discharging cells. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Loading Shredder. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

Dismantling. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

BMW Group scores circular economy win with high-voltage batteries. (01/2025)

Fenntarthatóság
·
Vállalati
13.01.2025

First filling at the plant with HVO 100. Plant Manager Christoph Schröder at the BMW Group Plant Dingolfing. December 2024

Üzemek, létesítmények
·
Gyártóüzemek
·
Vállalati
·
Fenntarthatóság
·
Gyártás és újrahasznosítás
·
Technológia
·
Motorok és váltók
10.01.2025
BMW festive campaign “Das Geschenk”
BMW örökség
·
Örökség
 
Downloads.
20.12.2024 | ID: P90582603
BMW festive campaign “Das Geschenk”
BMW festive campaign “Das Geschenk”
BMW örökség
·
Örökség
 
Downloads.
20.12.2024 | ID: P90582602
BMW festive campaign “Das Geschenk”
BMW festive campaign “Das Geschenk”
BMW örökség
·
Örökség
 
Downloads.
20.12.2024 | ID: P90582601
BMW festive campaign “Das Geschenk”
BMW festive campaign “Das Geschenk”
BMW örökség
·
Örökség
 
Downloads.
20.12.2024 | ID: P90582600
BMW festive campaign “Das Geschenk”
BMW festive campaign “Das Geschenk”
BMW örökség
·
Örökség
 
Downloads.
20.12.2024 | ID: P90582599
BMW festive campaign “Das Geschenk”
BMW festive campaign “Das Geschenk”
BMW örökség
·
Örökség
 
Downloads.
20.12.2024 | ID: P90582598
BMW festive campaign “Das Geschenk”
BMW festive campaign “Das Geschenk”
BMW örökség
·
Örökség
 
Downloads.
20.12.2024 | ID: P90582597
BMW festive campaign “Das Geschenk”
BMW festive campaign “Das Geschenk”
BMW örökség
·
Örökség
 
Downloads.
20.12.2024 | ID: P90582596
BMW festive campaign “Das Geschenk”
Grand Hotel Villa d'Este
Örökség
·
Veterános események
 
Downloads.
11.12.2024 | ID: P90581296
Grand Hotel Villa d'Este
Grand Hotel Villa d'Este
Örökség
·
Veterános események
 
Downloads.
11.12.2024 | ID: P90581295
Grand Hotel Villa d'Este
Concorso d'Eleganza Villa d'Este Key Visual 2025
Örökség
·
Veterános események
 
Downloads.
11.12.2024 | ID: P90581294
Concorso d'Eleganza Villa d'Este Key Visual 2025
Concorso d'Eleganza Villa d'Este Key Visual 2025
Örökség
·
Veterános események
 
Downloads.
11.12.2024 | ID: P90581293
Concorso d'Eleganza Villa d'Este Key Visual 2025
Concorso d'Eleganza Villa d'Este Key Visiual 2025
Örökség
·
Veterános események
 
Downloads.
11.12.2024 | ID: P90581292
Concorso d'Eleganza Villa d'Este Key Visiual 2025
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
 
Downloads.
13.01.2025 | ID: P90584219
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
 
Downloads.
13.01.2025 | ID: P90584218
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
 
Downloads.
13.01.2025 | ID: P90584217
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584011
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584010
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584007
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584005
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584004
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Metal Fraction after Recycling Process. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584003
Metal Fraction after Recycling Process. (01/2025)
Dismantling and Discharging Modules. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584001
Dismantling and Discharging Modules. (01/2025)
Voltage Testing Modules. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584000
Voltage Testing Modules. (01/2025)
Discharging Modules. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583996
Discharging Modules. (01/2025)
Discharging Modules. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583995
Discharging Modules. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583994
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583993
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583991
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Dismantling High Voltage Battery. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583990
Dismantling High Voltage Battery. (01/2025)
Dismantling High Voltage Battery. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583989
Dismantling High Voltage Battery. (01/2025)
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Gyártás és újrahasznosítás
·
Technológia
·
Electrification
·
Üzemek, létesítmények
·
Gyártóüzemek
 
Downloads.
13.01.2025 | ID: P90562429
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
Üzemek, létesítmények
·
Gyártóüzemek
·
Gyártás és újrahasznosítás
·
Technológia
·
Electrification
 
Downloads.
13.01.2025 | ID: P90562428
BMW Group high-voltage battery production network grows to 10 facilities, following the "local for local" principle (07/2024)
From the cell to the high-voltage battery of the fifth generation. The production system for the high-voltage battery can be divided into three ...
Electrification
·
Technológia
 
Downloads.
13.01.2025 | ID: P90491709
From the cell to the high-voltage battery of the fifth generation. The production system for the high-voltage battery can be divided into three autonomous, sequential process steps: cell painting, module production and battery assembly. (01/2023)
The fifth-generation of BMW Group's electric drive. Its main components are the electric drive unit and the high-voltage battery. The electric drive ...
Electrification
·
Technológia
 
Downloads.
13.01.2025 | ID: P90491708
The fifth-generation of BMW Group's electric drive. Its main components are the electric drive unit and the high-voltage battery. The electric drive unit consists of the electric engine, the transmission and the power electronics. It does not contain any rare earths. The high-voltage battery consists of several battery modules, which are interconnected and integrated into the housing. (01/2023)
Preparation Recycling Process. Discharging cells. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584009
Preparation Recycling Process. Discharging cells. (01/2025)
Loading Shredder. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90584008
Loading Shredder. (01/2025)
Dismantling. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583998
Dismantling. (01/2025)
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
Fenntarthatóság
·
Vállalati
 
Downloads.
13.01.2025 | ID: P90583997
BMW Group scores circular economy win with high-voltage batteries. (01/2025)
First filling at the plant with HVO 100. Plant Manager Christoph Schröder at the BMW Group Plant Dingolfing. December 2024
Üzemek, létesítmények
·
Gyártóüzemek
·
Vállalati
·
Fenntarthatóság
·
Gyártás és újrahasznosítás
·
Technológia
·
Motorok és váltók
 
Downloads.
10.01.2025 | ID: P90581867
First filling at the plant with HVO 100. Plant Manager Christoph Schröder at the BMW Group Plant Dingolfing. December 2024

Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Bejelentkezés