40 years of BMW Group Plant Regensburg: The official start of production in vehicle assembly was honored by the former Chairman of the Board of Management Eberhard von Kuenheim on November 17, 1986. (01/2025)
Laying of the foundation stone for the BMW Group Plant Regensburg on April 2, 1984, with the former Bavarian Minister-President Franz-Josef Strauß (01/2025)
Signing of the contract for the BMW Group Plant Regensburg on July 23, 1983 with the former Chairman of the Board of Management Eberhard von Kuenheim and Head of Production Hans Koch (01/2025)
Wackersdorf (03/2026)
Jörg Lederbauer, Vice President Circular Economy, Spare Parts Supply HVB and Electric Powertrain BMW Group; Stefan Betz, Head of BMW Plant Wackersdorf, Material Control Overseas Plants; Richard Tischler, Deputy District Administrator of Schwandorf Area; Thomas Falter, Mayor of the Municipality of Wackersdorf; André Mandl, Chair of the Works Council at the BMW Group plants in Regensburg and Wackersdorf (f.l.t.r.)
100 million euro investment for new battery test centre: BMW Group’s Wackersdorf location set to become a major facilitator for the transformation towards electromobility. (09/2023)
Two new technologies will enrich the BMW Group plant Wackersdorf: door production for Rolls-Royce and battery test center are coming to the site (01/2023)
40 years of BMW Group Plant Regensburg: The official start of production in vehicle assembly was honored by the former Chairman of the Board of Management Eberhard von Kuenheim on November 17, 1986. (01/2025)
Related Articles.
40 years of BMW Group Plant Regensburg: The first vehicle - a BMW 3 Series (E30) - rolled off the production line in October 1986. (01/2025)
Laying of the foundation stone for the BMW Group Plant Regensburg on April 2, 1984, with the former Bavarian Minister-President Franz-Josef Strauß (01/2025)
Related Articles.
Signing of the contract for the BMW Group Plant Regensburg on July 23, 1983 with the former Chairman of the Board of Management Eberhard von Kuenheim ...
Signing of the contract for the BMW Group Plant Regensburg on July 23, 1983 with the former Chairman of the Board of Management Eberhard von Kuenheim and Head of Production Hans Koch (01/2025)
Related Articles.
The last second generation BMW 3 Series sedan (E30) at plant Regensburg (04/1991)
BMW iX2 nu ook leverbaar als Pure Edition (04/2026)
Related Articles.
Wackersdorf (03/2026)
Jörg Lederbauer, Vice President Circular Economy, Spare Parts Supply HVB and Electric Powertrain BMW Group; Stefan Betz, Head ...
Wackersdorf (03/2026)
Jörg Lederbauer, Vice President Circular Economy, Spare Parts Supply HVB and Electric Powertrain BMW Group; Stefan Betz, Head of BMW Plant Wackersdorf, Material Control Overseas Plants; Richard Tischler, Deputy District Administrator of Schwandorf Area; Thomas Falter, Mayor of the Municipality of Wackersdorf; André Mandl, Chair of the Works Council at the BMW Group plants in Regensburg and Wackersdorf (f.l.t.r.)
Related Articles.
BMW Group Plant Wackersdorf, aerial view (11/2025)
100 million euro investment for new battery test centre: BMW Group’s Wackersdorf location set to become a major facilitator for the transformation towards electromobility. (09/2023)
Related Articles.
Two new technologies will enrich the BMW Group plant Wackersdorf: door production for Rolls-Royce and battery test center are coming to the site ...
Two new technologies will enrich the BMW Group plant Wackersdorf: door production for Rolls-Royce and battery test center are coming to the site (01/2023)
All data provisional. Please note: Since no binding WLTP values are currently available, these are provisional values. In addition, the actual values depend on various factors, such as load, driving style, route, weather, auxiliary consumers (including air conditioning), tyres, and the age of the battery.
Due to regular software updates, screen designs in the communication may differ from the actual screen design in your car.