Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Canada · Video.

BMW Group Plant Dingolfing pilots new paint process: Overspray-free paint application opens up a wide range of possibilities for customisation. Plant ...
 
G82
·
M4
·
Coupé
·
M Cars
·
Production Plants
·
Plants, Facilities
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


In the conventional procedure, paint is atomised by a rotating bell with 35 to 55,000 revolutions per minute and adheres electrostatically to the body. The new method works without electrostatics, relying instead on jet application. The paint is applied using an orifice plate that enables high edge definition with a variable paint thickness of between 1 and 48 millimetres. This requires maximum precision from both the robot and application technology.
Downloads.
Thu Sep 30 15:01:46 CEST 2021 | ID: PF0008598
BMW Group Plant Dingolfing pilots new paint process: Overspray-free paint application opens up a wide range of possibilities for customisation. Plant Dingolfing.
In the conventional procedure, paint is atomised by a rotating bell with 35 to 55,000 revolutions per minute and adheres electrostatically to the body. The new method works without electrostatics, relying instead on jet application. The paint is applied using an orifice plate that enables high edge definition with a variable paint thickness of between 1 and 48 millimetres. This requires maximum precision from both the robot and application technology.

BMW Group Plant Dingolfing pilots new paint process: Overspray-free paint application opens up a wide range of possibilities for customisation. Plant Dingolfing.

G82
·
M4
·
Coupé
·
M Cars
·
Production Plants
·
Plants, Facilities
Thu Sep 30 15:01:46 CEST 2021

Designtalk M4 Coupé meets BMW M4 GT3

G82
·
M4
·
Coupé
·
M Cars
Wed Apr 21 23:52:03 CEST 2021

The new BMW M4 Competition Coupé (09/2020).

G82
·
4 Series
·
M Cars
·
M4
·
Coupé
Wed Sep 23 03:30:15 CEST 2020

Manufacturing Process of the new BMW M3 at BMW Group Plant Munich.

G80
·
M Cars
·
M3
·
Production, Recycling
·
Technology
·
Plants, Facilities
·
Production Plants
Wed Nov 04 13:37:45 CET 2020

Production of the all-new BMW 8 Series Coupe at BMW Group Plant Dingolfing (short version).

G15
·
Production Plants
·
Plants, Facilities
·
8 Series
·
Coupé
Tue Jul 10 16:16:41 CEST 2018

Production of the all-new BMW 8 Series Coupe at BMW Group Plant Dingolfing (long version).

G15
·
Production Plants
·
Plants, Facilities
·
8 Series
·
Coupé
Mon Jul 09 14:29:09 CEST 2018

BMW M4 Coupé

F82
·
M4
·
M Cars
·
BMW M
·
Coupé
Tue Feb 18 15:56:20 CET 2014

Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed

Production Plants
·
Plants, Facilities
Mon Jan 05 19:12:17 CET 2026

The Paint Shop at BMW Group Plant Debrecen.

Plants, Facilities
·
Production Plants
Tue Sep 23 15:23:41 CEST 2025

The Paint Shop at BMW Group Plant Debrecen. (Clean)

Plants, Facilities
·
Production Plants
Tue Sep 23 15:23:41 CEST 2025

Quality at BMW Group Plant Debrecen.

Plants, Facilities
·
Production Plants
Tue Sep 23 15:23:41 CEST 2025

The Body Shop at BMW Group Plant Debrecen.

Plants, Facilities
·
Production Plants
Tue Sep 23 15:23:41 CEST 2025
BMW Group Plant Dingolfing pilots new paint process: Overspray-free paint application opens up a wide range of possibilities for customisation. Plant ...
 
G82
·
M4
·
Coupé
·
M Cars
·
Production Plants
·
Plants, Facilities
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


In the conventional procedure, paint is atomised by a rotating bell with 35 to 55,000 revolutions per minute and adheres electrostatically to the body. The new method works without electrostatics, relying instead on jet application. The paint is applied using an orifice plate that enables high edge definition with a variable paint thickness of between 1 and 48 millimetres. This requires maximum precision from both the robot and application technology.
Downloads.
Thu Sep 30 15:01:46 CEST 2021 | ID: PF0008597
BMW Group Plant Dingolfing pilots new paint process: Overspray-free paint application opens up a wide range of possibilities for customisation. Plant Dingolfing.
In the conventional procedure, paint is atomised by a rotating bell with 35 to 55,000 revolutions per minute and adheres electrostatically to the body. The new method works without electrostatics, relying instead on jet application. The paint is applied using an orifice plate that enables high edge definition with a variable paint thickness of between 1 and 48 millimetres. This requires maximum precision from both the robot and application technology.
Designtalk M4 Coupé meets BMW M4 GT3
 
G82
·
M4
·
Coupé
·
M Cars
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Designtalk about the BMW M4 Coupé and the BMW M4 GT3.  Michael Scully, BMW Design Works talks with Anne Forschner, Exterior Designer BMW Design. Both are talking about design aspects wich both cars have in common or are different in. 
Downloads.
Wed Apr 21 23:52:03 CEST 2021 | ID: PF0008355
Designtalk M4 Coupé meets BMW M4 GT3
Designtalk about the BMW M4 Coupé and the BMW M4 GT3.  Michael Scully, BMW Design Works talks with Anne Forschner, Exterior Designer BMW Design. Both are talking about design aspects wich both cars have in common or are different in. 
The new BMW M4 Competition Coupé (09/2020).
 
G82
·
4 Series
·
M Cars
·
M4
·
Coupé
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Wed Sep 23 03:30:15 CEST 2020 | ID: PF0007947
The new BMW M4 Competition Coupé (09/2020).
Manufacturing Process of the new BMW M3 at BMW Group Plant Munich.
 
G80
·
M Cars
·
M3
·
Production, Recycling
·
Technology
·
Plants, Facilities
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Wed Nov 04 13:37:45 CET 2020 | ID: PF0008072
Manufacturing Process of the new BMW M3 at BMW Group Plant Munich.
Production of the all-new BMW 8 Series Coupe at BMW Group Plant Dingolfing (short version).
 
G15
·
Production Plants
·
Plants, Facilities
·
8 Series
·
Coupé
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Jul 10 16:16:41 CEST 2018 | ID: PF0006117
Production of the all-new BMW 8 Series Coupe at BMW Group Plant Dingolfing (short version).
Production of the all-new BMW 8 Series Coupe at BMW Group Plant Dingolfing (long version).
 
G15
·
Production Plants
·
Plants, Facilities
·
8 Series
·
Coupé
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Mon Jul 09 14:29:09 CEST 2018 | ID: PF0006112
Production of the all-new BMW 8 Series Coupe at BMW Group Plant Dingolfing (long version).
BMW M4 Coupé
 
F82
·
M4
·
M Cars
·
BMW M
·
Coupé
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Feb 18 15:56:20 CET 2014 | ID: PF0003856
BMW M4 Coupé
Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed
 
Production Plants
·
Plants, Facilities
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
Downloads.
Mon Jan 05 19:12:17 CET 2026 | ID: PF0010103
Warm-up for Neue Klasse at BMW Group Plant Munich: Functional checks of new production equipment successfully completed
BMW Group Plant Munich is ready for the production of the next vehicle generation. The manufacturing equipment has been installed in the new body shop and assembly line, and functional checks have been successfully completed. During this so-called "Common Function Test," every system undergoes dry runs, in which production planners and plant technicians put the machinery through its paces. All production steps are executed without any parts in the system. Cycle by cycle, an invisible vehicle takes shape. Although no actual car is produced, this process provides the certainty that everything operates seamlessly and as planned.
The Paint Shop at BMW Group Plant Debrecen.
 
Plants, Facilities
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Sep 23 15:23:41 CEST 2025 | ID: PF0010080
The Paint Shop at BMW Group Plant Debrecen.
The Paint Shop at BMW Group Plant Debrecen. (Clean)
 
Plants, Facilities
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Sep 23 15:23:41 CEST 2025 | ID: PF0010079
The Paint Shop at BMW Group Plant Debrecen. (Clean)
Quality at BMW Group Plant Debrecen.
 
Plants, Facilities
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Sep 23 15:23:41 CEST 2025 | ID: PF0010078
Quality at BMW Group Plant Debrecen.
The Body Shop at BMW Group Plant Debrecen.
 
Plants, Facilities
·
Production Plants
 
Embed this video
Select video size....
  • 560 x 315
  • 640 x 360
  • 853 x 480
  • 1280 x 720
  • Custom size
x


Downloads.
Tue Sep 23 15:23:41 CEST 2025 | ID: PF0010068
The Body Shop at BMW Group Plant Debrecen.

Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View

Set publication time.

no Selection
  • no Selection
  • past 24 hours
  • past Week
  • past Month
  • past Year
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Login