Do you need help? Please contact our support team from 9 to 17 CET via
support.pressclub@bmwgroup.com.
PressClub Romania · Photo.
Signing of contracts to connect the BMW Group Plant Leipzig to a hydrogen pipeline: Petra Peterhänsel (Head of BMW Group Plant Leipzig), Christian ...
Downloads.
Wed Oct 01 11:25:36 CEST 2025 | ID: P90620031
Signing of contracts to connect the BMW Group Plant Leipzig to a hydrogen pipeline: Petra Peterhänsel (Head of BMW Group Plant Leipzig), Christian Rosin (Head of Implementation and Operations at MITNETZ GAS), and Ralph Bahke (Managing Director of System Management and Development at ONTRAS Gastransport) – from left to right. (09/2025)