Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Romania · Photos · Corporativ.

Photo
 
Compilation
 
+ Search Settings

Start producţie pentru BMW M5 Touring la cea mai mare fabrică BMW din Germania

G99
·
Dingolfing
·
Automobile BMW M
·
Touring
·
M5
·
BMW Welt, Museum, fabrici
·
Fabrici
Tue Nov 05 15:26:44 CET 2024
1 Sets, 4 Photos

Uzină conectată inteligent: fabrica BMW Group din Regensburg se îndreaptă spre digitalizarea şi automatizarea logisticii cu un sistem de control al traficului bazat pe cloud

Corporativ
·
BMW Welt, Museum, fabrici
·
Fabrici
Tue Nov 05 11:11:14 CET 2024
1 Sets, 8 Photos

Uzina BMW Group din Regensburg câştigă "Factory of the Year"

Tehnologie
·
Corporativ
·
BMW Welt, Museum, fabrici
·
Producţie, reciclare
Thu Oct 24 11:01:00 CEST 2024
1 Sets, 17 Photos

Toţi cei 1066 de stâlpi ai fabricii de asamblare a bateriilor de înaltă tensiune sunt la locul lor

Straßkirchen
·
Irlbach
·
Irlbach-Straßkirchen
·
Stütze
·
Construction
·
Tehnologie
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Sistem de propulsie alternativă, mobilitatea viitorului
·
Electrification
Tue Oct 22 17:03:17 CEST 2024
1 Sets, 7 Photos

BMW o omagiază pe Esther Mahlangu ca partener oficial al Frieze London 2024

Corporativ
·
Teme culturale
Thu Sep 19 12:08:00 CEST 2024
4 Sets, 11 Photos

Uzina BMW Group din Steyr schimbă alimentarea cu energie termică, de la gaz la o sursă regenerabilă

Steyr
·
iFactory
·
Tehnologie
·
Corporativ
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Dezvoltare durabilă
·
Producţie, reciclare
Wed Sep 18 13:00:00 CEST 2024
2 Sets, 16 Photos

Cooperare în cercetare: BMW Group şi Universitatea din Zagreb optimizează producţia de celule de baterii prin inteligenţă artificială

Battery Cell Competence Centre
·
battery cell
·
High-voltage battery
·
Tehnologie
·
Societate
·
Dezvoltare durabilă
·
Sistem de propulsie alternativă, mobilitatea viitorului
·
Producţie, reciclare
·
Electrification
Thu Sep 12 09:00:00 CEST 2024
1 Sets, 13 Photos

Centrul de Reciclare şi Dezmembrare (RDC) al BMW Group: 30 de ani avangardă în economia circulară

Corporativ
·
Dezvoltare durabilă
Mon Sep 09 11:41:42 CEST 2024
1 Sets, 17 Photos

BMW Group testează o soluție inovatoare în domeniul energiei eoliene ca premieră în Marea Britanie

Corporativ
·
BMW Welt, Museum, fabrici
·
Fabrici
Wed Sep 04 17:21:01 CEST 2024
1 Sets, 5 Photos

Lucrurile prind culoare la Debrecen - atelierul de vopsitorie devine prima tehnologie care a fost pusă în funcţiune la noua uzină BMW Group

Paint Shop
·
iFactory
·
Tehnologie
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Producţie, reciclare
Thu Aug 29 13:01:46 CEST 2024
1 Sets, 15 Photos

Premieră mondială – Engage Racing prezintă BMW i4 Racing, un proiect Made in Romania

G26
·
Tehnologie
·
BMW i
·
Corporativ
·
Dezvoltare durabilă
·
Sports
·
BMW i4
Wed Aug 28 15:20:00 CEST 2024
1 Sets, 49 Photos

BMW Welt şi Muzeul BMW sărbătoresc 40 de ani de BMW M5

F90
·
Automobile BMW M
·
M5
·
BMW Welt, Museum, fabrici
·
BMW Welt
·
BMW Museum
Fri Aug 16 13:27:28 CEST 2024
1 Sets, 4 Photos

New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)

BMW Welt, Museum, fabrici
·
Fabrici
·
Producţie, reciclare
·
Tehnologie
Mon Nov 04 08:27:40 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:40 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:40 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:40 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:40 CET 2024

All four models from the BMW Group plant in Leipzig (from left): BMW 2 Series Gran Coupé, BMW 1 Series, BMW 2 Series Active Tourer, MINI Countryman (11/2024)

BMW Welt, Museum, fabrici
·
Fabrici
Mon Nov 04 08:27:40 CET 2024

New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)

BMW Welt, Museum, fabrici
·
Fabrici
·
Producţie, reciclare
·
Tehnologie
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)

F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
Mon Nov 04 08:27:39 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
Mon Oct 28 10:08:30 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
Mon Oct 28 10:08:30 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
Mon Oct 28 10:08:30 CET 2024

BMW Group Plant Regensburg: Assembly line, finish (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg – Production (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg – Production (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg – Production (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg – Aerial View (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg – Aerial View (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)

U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)

U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
Mon Oct 28 10:08:29 CET 2024

Digital construction planning is an essential part of virtual production planning. Construction-, system-. and logistics-planning are brought together digitally, thus reducing construction time and helping to collaborate on critical interfaces at an early stage. (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Tue Oct 22 17:03:17 CEST 2024

In the so-called “centre brace”, construction began on the side buildings, i.e. company catering, energy and service center and the company fire department, as planned in summer. (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Tue Oct 22 17:03:17 CEST 2024

Parallel to the position of the last pillar, the roof at the other end of the 300 by 500 meter long assembly hall is already being closed, windows are being installed and the first technical building equipment is being installed. (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Tue Oct 22 17:03:17 CEST 2024

The concrete pillar, which weighs around nine tons, is transported by a crawler crane to the intended location on the construction site. (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Tue Oct 22 17:03:17 CEST 2024

In around 100 working days, a total of 1066 concrete pillars were brought vertically on the construction site. (10/2024)

Fabrici
·
BMW Welt, Museum, fabrici
Tue Oct 22 17:03:17 CEST 2024
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
BMW Welt, Museum, fabrici
·
Fabrici
·
Producţie, reciclare
·
Tehnologie
 
Downloads.
Mon Nov 04 08:27:40 CET 2024 | ID: P90577447
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:40 CET 2024 | ID: P90577439
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:40 CET 2024 | ID: P90577435
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:40 CET 2024 | ID: P90577429
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:40 CET 2024 | ID: P90577428
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
All four models from the BMW Group plant in Leipzig (from left): BMW 2 Series Gran Coupé, BMW 1 Series, BMW 2 Series Active Tourer, MINI Countryman ...
BMW Welt, Museum, fabrici
·
Fabrici
 
Downloads.
Mon Nov 04 08:27:40 CET 2024 | ID: P90577427
All four models from the BMW Group plant in Leipzig (from left): BMW 2 Series Gran Coupé, BMW 1 Series, BMW 2 Series Active Tourer, MINI Countryman (11/2024)
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
BMW Welt, Museum, fabrici
·
Fabrici
·
Producţie, reciclare
·
Tehnologie
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577448
New installation for assembling the tailgate of the BMW 2 Series Gran Coupé in the body shop at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577444
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577443
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577442
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577441
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577440
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577437
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577434
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577433
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577432
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577431
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
F74
·
BMW Welt, Museum, fabrici
·
Fabrici
·
Seria 2
·
Gran Coupé
 
Downloads.
Mon Nov 04 08:27:39 CET 2024 | ID: P90577430
Production of the new BMW 2 Series Gran Coupé at BMW Group Plant Leipzig (11/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
 
Downloads.
Mon Oct 28 10:08:30 CET 2024 | ID: P90571982
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
 
Downloads.
Mon Oct 28 10:08:30 CET 2024 | ID: P90571981
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
 
Downloads.
Mon Oct 28 10:08:30 CET 2024 | ID: P90571980
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Assembly line, finish (10/2024)
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571989
BMW Group Plant Regensburg: Assembly line, finish (10/2024)
BMW Group Plant Regensburg – Production (10/2024)
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571988
BMW Group Plant Regensburg – Production (10/2024)
BMW Group Plant Regensburg – Production (10/2024)
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571987
BMW Group Plant Regensburg – Production (10/2024)
BMW Group Plant Regensburg – Production (10/2024)
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571986
BMW Group Plant Regensburg – Production (10/2024)
BMW Group Plant Regensburg – Aerial View (10/2024)
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571985
BMW Group Plant Regensburg – Aerial View (10/2024)
BMW Group Plant Regensburg – Aerial View (10/2024)
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571984
BMW Group Plant Regensburg – Aerial View (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571983
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571979
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
U10
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
·
BMW iX2
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571978
BMW Group Plant Regensburg: Production of the fully electric BMW iX2 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571977
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571976
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571975
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571974
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
U11
·
BMW iX1
·
BMW i
·
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Mon Oct 28 10:08:29 CET 2024 | ID: P90571973
BMW Group Plant Regensburg: Production of the fully electric BMW iX1 (10/2024)
Digital construction planning is an essential part of virtual production planning. Construction-, system-. and logistics-planning are brought together ...
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Tue Oct 22 17:03:17 CEST 2024 | ID: P90574203
Digital construction planning is an essential part of virtual production planning. Construction-, system-. and logistics-planning are brought together digitally, thus reducing construction time and helping to collaborate on critical interfaces at an early stage. (10/2024)
In the so-called “centre brace”, construction began on the side buildings, i.e. company catering, energy and service center and the company fire ...
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Tue Oct 22 17:03:17 CEST 2024 | ID: P90574202
In the so-called “centre brace”, construction began on the side buildings, i.e. company catering, energy and service center and the company fire department, as planned in summer. (10/2024)
Parallel to the position of the last pillar, the roof at the other end of the 300 by 500 meter long assembly hall is already being closed, windows are ...
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Tue Oct 22 17:03:17 CEST 2024 | ID: P90574201
Parallel to the position of the last pillar, the roof at the other end of the 300 by 500 meter long assembly hall is already being closed, windows are being installed and the first technical building equipment is being installed. (10/2024)
The concrete pillar, which weighs around nine tons, is transported by a crawler crane to the intended location on the construction site. (10/2024)
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Tue Oct 22 17:03:17 CEST 2024 | ID: P90574200
The concrete pillar, which weighs around nine tons, is transported by a crawler crane to the intended location on the construction site. (10/2024)
In around 100 working days, a total of 1066 concrete pillars were brought vertically on the construction site. (10/2024)
Fabrici
·
BMW Welt, Museum, fabrici
 
Downloads.
Tue Oct 22 17:03:17 CEST 2024 | ID: P90574199
In around 100 working days, a total of 1066 concrete pillars were brought vertically on the construction site. (10/2024)

Search Settings.

Photo
Compilation
Portrait
Landscape
Stand Still View
Exterior
Interior
Engines
Drawings
Technology
Production
On Location
Driving View
Submit
Reset
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Conectare