Do you need help? Please contact our support team from 9 to 17 CET via support.pressclub@bmwgroup.com.

PressClub Nederland · Article.

BMW Brilliance Automotive bereikt mijlpaal met de productie van haar 6.000.000e auto

+++ 1 miljoen auto's geproduceerd in de afgelopen 15 maanden +++ Nedeljković: "Focus op concurrentievermogen en innovativiteit" +++ Shenyang gaat ook door met de voorbereidingen voor de Neue Klasse +++ Bijgaand het volledig, Engelstalige persbericht.

China
·
BMW i5
·
Technologie
·
Fabrieken, faciliteiten
·
Fabrieken
·
Productie, Recycling
 

Press Contact.

Bryan Barendrecht
BMW Group

Tel: +31-704-133-227

send an e-mail

Downloads.

  
Attachments(1x, 445,97 KB)
  
Photos(7x, 74,47 MB)

Related Links.

Shenyang. The BMW i5 that recently rolled off the production line at Plant Dadong in China was a milestone: the fully electric model in Frozen Pure Grey was the 6 millionth car to be made by the BMW Brilliance Automotive (BBA) joint venture. It took just 15 months to produce the last million cars, with the five-million mark passed only in February of last year. The new milestone is evidence of the sheer dynamism and competitiveness of the plant network in Shenyang, where production volumes remain high even as the BBA plants prepare for the Neue Klasse.

“The 6 millionth car is a symbol of the outstanding achievements here in Shenyang,” said Milan Nedeljković, member of the Board of Management of BMW AG responsible for Production. “Just like in all our other plants around the world, the focus here is on competitiveness and innovativeness.”

Artificial intelligence supports quality assurance

The landmark vehicle underwent all the usual rigorous quality checks that take place in Plant Shenyang, including Automatic Surface Inspection in the paint shop. Here, each car is photographed 100,000 times and artificial intelligence is used to identify impurities, fibres, scratches or other minor defects in the paintwork – reliably and precise to the millimetre. Any irregularities are marked on the surface by laser and remedied.

Preparations for the Neue Klasse forge ahead

Meanwhile Shenyang is also preparing to launch production of the Neue Klasse. The BMW Group is currently erecting five high-voltage battery assembly facilities on three continents around the world, one of them in Shenyang where, after an investment of 10 billion RMB, sixth-generation high-voltage batteries will be produced. The building for the new facility was completed last November, and the installation of plant and equipment has been underway since March of this year. The first pre-series batteries are expected to roll off the production line at the end of this year. At the same time, comprehensive tests and localisation certifications are starting at the local R&D centre.

The Neue Klasse is due for launch worldwide in 2025, with China making its first Neue Klasse models from 2026. All three BBA plants – Dadong, Tiexi and Lydia – can already make fully electric cars.

Article Offline Attachments.

Article Media Material.

My.PressClub Inloggen
 

BMW Group Streaming

ANNUAL GENERAL MEETING.

Munich. Here you can watch the webcast of the 104 Annual General Meeting of BMW AG.

Open Streaming Page

CO2 emission information.

De CO2 efficiency specificaties zijn vastgesteld op basis van de huidige toepasselijke tekst van de EU Verordening 2017/1151. De getoonde waarden zijn gebaseerd op het brandstofverbruik, CO2 waarden en energieverbruik volgens de NEDC cyclus voor de classificatie. Aanvullende informatie met betrekking tot het officiële brandstofverbruik en de specifieke CO2 uitstoot van nieuwe personenvoertuigen kan verkregen worden uit het “Brandstofverbruiksboekje van de RDW”, dat digitaal verkrijgbaar is via de link.

Add your filter tags.

Persbericht
Persmap
Toespraak
Fact & Figures
Updates
Top-Topic
Submit filter
Clear all
 
Sun
Mon
Tue
Wed
Thu
Fri
Sat
 
Inloggen